Oregon Department of Transportation  
   
            Region 3      
                     
                     
  2006 - Top 10% Sites Investigative Report - By Hwy, MP          
                                   
Reg Dis Rte. H Rdwy Rd Name BMP EMP ADT C F Max SPIS * Date Review Completed Problem Description Potential Remedies $$$ Impediments to Implementation  
                                   
3 08 I-5 001 1 PACIFIC 70.03 70.35 20,700 14 1 64.58 8/10/06 wet surface, inadequate drainage, out of area drivers improve friction, improve drainage, improve superelevation  1M? enviromental  
                            surface will be replaced prior to Oct. 2006, signs in 07      
3 07 US-101    009 1 OREGON COAST 234.94 235.12 16,200 14 0 63.31 7/12/06 high V/C ratio, congestion, turning radius, rear-end & ped incidents narrow 4-lane, downtown North Bend  Dedicated US 101 left turn lanes, improved pedestrian sidewalks, reduce 4-lane to 3-lane  600K mast arm replacements, striping removal, new loop installations, improved pedestrian sidewalks, corridor study needed  
                                   
3 07 US-101    009 1 OREGON COAST 235.32 235.50 9,600 30 1 65.33 7/12/06 high V/C ratio, congestion, turning radius, volume of turning traffic, downtown North Bend increase capacity, add turn lanes 25M R/W costs, funding, business owners, corridor study needed  
                                   
3 07 US-101    009 1 OREGON COAST 238.91 239.02 16,100 19 0 46.39            
                                   
3 07 US-101    009 1 OREGON COAST 357.40 357.58 18,500 23 0 52.79            
                                   
3 08 OR-66 021 1 GREEN SPRINGS 0.95 1.13 14,100 11 1 63.09 8/15/06 multiple driveways, increased culture, change of use  right in, right out at YMCA Way, raised median 500K community may object to change  
                                   
3 08 OR-66 021 1 GREEN SPRINGS 1.27 1.37 14,100 5 0 47.63 8/15/06 off ramp grades, narrow bridge, high V/C ratio  replace bridge* install signals if warranted 38M* * part of bundle project OTIA III 2008  
                                   
3 08 OR-62 022 1 CRATER LAKE 0.38 0.98 38,500 47 0 77.70 8/16/06 high V/C ratio, congestion Project completed at interchange in spring 2006  35M+ none left, finishing up final pieces  
                                   
3 08 OR-62 022 1 CRATER LAKE 1.31 1.67 43,300 40 0 68.98 8/16/06 high V/C ratio, congestion part of Hwy 62 Corridor Solutions Part 2 in Planning Stage 35M local buy in, R/W,EA, utilities   
                                   
3 08 OR-62 022 1 CRATER LAKE 2.20 2.34 30,000 17 0 53.74 8/16/06 high V/C ratio, congestion  part of Hwy 62 Corridor Solutions Part 2 in Planning Stage 35M local buy in, R/W, EA, utilities  
                                   
3 08 OR-62 022 1 CRATER LAKE 3.56 3.74 32,600 32 0 75.11 8/17/06 high volumes, mutiple conflict points, close proximity of Crater Ave.  High speed signalized intersection  move Crater Ave. away from Hwy 62 3M+ R/W, access change opposition   
                                   
3 08 OR-62 022 1 CRATER LAKE 5.94 6.22 29,700 29 0 62.44 8/17/06 congestion, multiple conflict points, increased development needs to be assessed in 2009 Modernization project to connect hwy 140 to I-5  3.3M utilities, local opposition to access changes, enviromental   
                                   
3 08 US-199    025 1 REDWOOD -2.54 -2.36 10,800 31 0 55.91 8/14/06 high V/C, confusing design, multiple conflict points, old sig up grade signals, improve grades, change configuration of 3M+ R/W costs, enviromental, funding   
                            intersection including SB off ramp & traffic from NB off ramp      
3 08 US-199    025 1 REDWOOD -2.25 -2.07 15,400 21 0 62.13 8/14/06 access's too close to intersection, restricted sight distance, distance across intersection restrict right turn movements on Red, eliminate parking, implement access management, partial curb extentions 500K Opposition from business community, possible R/W issue  
                                   
3 08 US-199    025 1 REDWOOD -1.03 -0.78 20,600 31 0 56.92 8/14/06 restricted sight distance, turning to and from side streets, congestion curb extentions, parking restrictions 100K Opposition from business owners  
                                   
3 08 US-199    025 2 REDWOOD -1.03 -0.85 18,600 25 0 58.10 8/14/06 restricted sight distance, turning to and from side streets, congestion  curb extentions, parking restrictions  100K Opposition from business owners  
                                   
3 08 US-199    025 2 REDWOOD -0.56 -0.38 23,500 18 0 52.28 8/14/06 restricted sight distance, turning to and from side streets, congestion curb extentions, parking restrictions  100K Opposition from business owvers  
                                   
3 08   025 1 REDWOOD -0.56 -0.46 20,100 30 0 53.45 8/14/06 congestion, major local intersection, turning to and from side streets, multiple conflict points  possibly need dual left turn lanes, E to S, restrict right turns on red W to S, narrow side street (M to the east), access  1M?  high R/W cost to widen M street, local opposition to restrict access movements   
                                   
3 08 US-199    025 1 REDWOOD 0.23 0.41 23,400 16 0 64.40 8/11/06 turning to and from side street  Raised median was completed Jan. 06 prevents left turns into and out of Tussey Lane onto Hwy 199 100K drainage was dealt with-zero reported crashes involving turns   
                                   
3 08 US-199    025 1 REDWOOD 0.53 1.09 37,700 51 0 79.92 8/11/06 high V/C, congestion part of Redwood Hwy. Corridor Project- down to 2 possible designs, EA in progress, funding is dedicated 10M getting all agencies to agree to design  
                                   
3 08   025 1 REDWOOD 0.77 0.95 28,800 34 0 76.51 8/11/06 high V/C, congestion, signals too close together part of Redwood Hwy Corridor Project-signal at the Fairground will be eliminated during project 10M    getting all agencies to agree to design  
                                   
3 08   025 1 REDWOOD 0.91 1.09 28,800 22 0 58.65 8/11/06 high V/C. congestion, signals too close together part of Redwood Hwy Corridor Project- Redwood Ave. intersection will go away and signa will be removed 10M getting all agencies to agree to design   
                                   
3 08 US-199    025 1 REDWOOD 2.02 2.14 21,800 12 0 46.68 8/11/06 high speed urban signalized intersection, distance across the intersection, local development adding traffic part of Redwood Hwy Corridor Project-Improvements on local arterial (Redwood Ave) will hopefully take some traffic away 10M getting all agencies to agree to design  
                                   
3 08 US-199    025 1 REDWOOD 2.98 3.16 14,800 7 1 54.85 8/11/06 high speed rural to urban intersectin, distance across intersection, high speed approaching traffic, turning  part of Redwood Hwy Corridor, intersection will be redesigned with improved radii, raised medians ?  10M getting all agencie to agree to design  
                                   
3 08 US-199    025 1 REDWOOD 3.91 4.08 14,800 4 4 60.67 8/11/06 high speed crossover crashes, head on and turning  Tall F barrier will be constructed in 2007, design is being worked on, project is funded by AASHTO safety funds 1.3M impediments have/will be dealt with  
                                   
3 08 US-199    025 1 REDWOOD 4.79 4.97 11,700 3 0 59.44 8/14/06 zero deflection principles for overhead irrigation collumns replace GM with metal rail, most likely Thrie-beam with the proper ends, eliminate area where truck parked  250K limited space between column and edge of pavement  
                                   
3 08 US-199    025 1 REDWOOD 25.91 26.09 8,300 5 1 49.53 8/14/06 uncontrolled access's, turning movements, fatal involved a dog and person who happened to be picking up mail  continous left turn lane through the community (Kerby) access management  2.5M R/W. utilities, access management funding source  
                                   
3 07 OR-42 035 1 COOS BAY-ROSEBURG 6.91 7.09 10,500 5 0 48.60            
                                   
3 07 OR-42 035 1 COOS BAY-ROSEBURG 45.74 45.85 3,500 11 1 52.98            
                                   
3 07 OR-42 035 1 COOS BAY-ROSEBURG 75.67 75.79 22,600 26 0 47.38