Skip to Main Content

Steps to Implementation

Use the following four steps to implement the requirements of this new standard:

  1. Gather Basic Information
  2. Identify Sign Maintenance Method(s)
  3. Prepare Budget
  4. Administer Sign Maintenance Program

Begin an interactive walkthrough of these steps.

Or, choose from a list of sign maintenance methods.