|
Section ZZZ. — Signing UpgradeDescriptionInclude the following for projects requiring assessment and inventory, and installation of permanent warning and regulatory signs.
ZZZ.01 This project consists of assessing, inventorying, and removing & installing [INSERT ground-mounted sign panels OR ground-mounted sign panels and sign supports] to comply with the minimum retroreflectivity requirements of Section 2A.09, of the Manual on Uniform Traffic Control Devices (MUTCD). The work is located along [INSERT ROUTE ID OR ROADWAY SYSYEM] in [INSERT COUNTY] County, [INSERT STATE]. Include the following for projects requiring only installation of warning and regulatory sign panels (when agency provides list of signs to be replaced).
XXX.01This project consists of removing and installing [INSERT ground-mounted sign panels OR ground-mounted sign panels and sign supports]. The work is located along [INSERT ROUTE ID OR ROADWAY SYSYEM] in [INSERT COUNTY] County, [INSERT STATE]. Include the following for projects requiring installation of permanent warning and regulatory sign panels OR insert agency standard. Edit specific material items as appropriate. Edit Subsection numbers as appropriate.
MaterialZZZ.02 Sign Panels. Conform to the Manual on Uniform Traffic Control Devices (MUTCD) and the following:
ZZZ.03 Sign Retroreflective Sheeting. Conform to the MUTCD and the following: Sign retroreflective sheeting shall conform to ASTM D 4956. Conform to ASTM D 4956 Supplemental Requirement S1, fungus Resistance, if specified. When an adhesive is used, use ASTM D 4956, backing class 1, 2, 3, or 4. ZZZ.04 Hardware. For lag screws, washers, clip angles, wood screws, shear plates, U-bolts, clamps, bolts, nuts, and other fasteners, use galvanized steel or aluminum alloy. For high-strength steel bolts, nuts, and washers, conform to either AASHTO M 164 or M 253 as specified. Galvanize steel hardware according to AASHTO M 232. For aluminum alloy bolts, nuts, and washers, conform to American standard heavy hexagon ANSI B18.2. For threads, conform to American standard coarse series, class 2 fit, ANSI specification B1.1. Furnish oversize bolt heads and oversize neoprene or nylon washers for plastic sign panels. ZZZ.05 Letters, Numerals, Arrows, Symbols, and Borders. Form letters, numerals, and other units to provide a continuous stroke width with smooth edges. Make the surface flat and free of warp, blisters, wrinkles, burrs, and splinters. Conform to one of the following:
Include the following for projects requiring assessment and inventory of warning and regulatory signs OR insert agency standard. Edit Subsection numbers as appropriate.
Sign Assessment and InventoryZZZ.06 Sign Retroreflectivty Assessment. Assess sign retroreflectivity according to this Subsection, FHWA's Maintaining Traffic Sign Retroreflectivity, Publication No. FHWA-SA-07-020, and Chapter 3 of FHWA’s Method for Maintaining Traffic Sign Retroreflectivity, Publication No. FHWA-HRT-08-026, November 2007. These two FHWA documents can be accessed at:
Provide a written narrative detailing the assessment method to be used (Visual Nighttime Inspection, Measured Sign Retroreflectivity, or a combination of these two methods), along with assessment procedures to be followed. Allow 7 days for agency approval of methodology and procedures. ZZZ.07 Location. Perform sign assessment and inventory from [INSERT milepost XX.XX to milepost XX.XX OR station XX+XX to station XX+XX]. Include signs on intersecting roads that are within 50 feet of the edge of traveled way along the main route. Include one of the following ZZZ.08 Nighttime Visual Inspection Subsections OR insert agency standard. Edit Subsection numbers as appropriate.
ZZZ.08 Visual Nighttime Inspection. Before beginning work, provide the following documentation and allow 7 days for approval and sign inspector acceptance:
ZZZ.09 Retroreflectivity Measurement. Perform retroreflective measurements using hand –held contact devices. Perform tests according to the manufacturer’s instructions and ASTM Standard Test Method E1709-00e1. ZZZ.10 Sign Assessment and Inventory Documentation. Provide one paper copy and an [INSERT PREFERRED TYPE OF ELECTRONIC FILE] electronic copy of the sign assessment with the following information:
See Figure 1 for example inventory documentation. Allow 14 days for agency review and approval. Acceptance of sign assessment and inventory will be based on agency visual or measured QA/QC. Include the following for projects requiring installation of warning and regulatory sign panels OR insert agency standard. Edit Subsection numbers as appropriate.
Construction RequirementsZZZ.11 General. Remove and replace all sign panels as determined by the agency. ZZZ.12 Panels. Use ASTM prismatic type III, IV, VIII, IX, or X retroreflective sheeting. Use type L-1 letters, numerals, arrows, symbols, and borders. Cut panels to size and shape and drill or punch all holes. Make panels flat and free of buckles, warp, dents, cockles, burrs, and other defects. Clean and degrease the face of metal panels using methods recommended by the retroreflective sheeting manufacturer. Abrade, clean, and degrease the face of the plywood panels using methods recommended by the retroreflective sheeting manufacturer. Treat the edges of the plywood panel with an approved edge sealant. Apply the retroreflective sheeting material to the panels. Package sign panels in protective material and transport them in a vertical position. Mount sign panels with the legend horizontal. Where multiple panels adjoin, limit the gap between adjacent panels to 1/16 inch. Do not field drill holes in any part of the panel. Use antitheft fasteners where possible. Paint all bolt heads, screw heads, and washers that are exposed on the sign face. Match the color of the paint to the color of the background or message area at the point where the fitting is exposed. Include the following for projects requiring installation of warning and regulatory sign panels OR insert agency standard. Edit Subsection numbers as appropriate.
AcceptanceZZZ.13 Furnish commercial material certification for sign panels, A commercial certification is a manufacturer’s or Contractor’s representation that the material complies with all contract requirements. The representation may be labels, catalog data, stamped specification standards, or supplier’s certifications indicating the material is produced to a commercial standard or specification. Material accepted by certification may be sampled and tested at any time. If found not in conformance with the contract, the material will be rejected whether in place or not. Acceptance for sign legends will be evaluated based on visual inspection of the work for compliance with the contract and prevailing industry standards MeasurementInclude the following for projects requiring assessment and inventory of warning and regulatory signs. Edit Subsection numbers as appropriate.
ZZZ.14 Measure sign assessment and inventory by lump sum. Include the following for projects requiring installation of warning and regulatory sign panels OR insert agency standard. Edit Subsection numbers as appropriate.
Measure signs as follows:
Include the following for projects requiring assessment and inventory, and installation of warning and regulatory sign panels. Edit Subsection numbers as appropriate.
PaymentZZZ.14 The accepted quantities will be paid at the contract price per unit of measurement for the items listed in the bid schedule. The quantity paid will not exceed the corresponding maximum estimated quantity in the schedule. Payment will be full compensation for the work prescribed in this Section.
When the words “fixed rate” appears as a unit bid price, include the Agency inserted amount bid for the item in the total bid amount. Insert the maximum estimated quantity associated with bid item #002. Insert unit bid price, in figures, for bid item #002. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Agency show a mistake in the amount bid, the corrected unit price extension shall govern. Total all of the amounts bid for each pay item and show the total bid amount. Evaluation of BidZZZ.15 Evaluation of bid will be based on the total cost of bid item #002, utilizing the maximum square foot sign quantity estimated and the unit cost. Figure 1
The following supplemental section may be used if sign support installation is anticipated. Insert into Materials Subsection and renumber as appropriate. Include additional column for support type in assessment and inventory table, and bid items.
SUPPLEMENTAL SECTIOZZZ.XX Posts. Conform to the MUTCD and the following: Posts are designated as [INSERT wood, aluminum, galvanized steel, or corrosion resistant steel.]
|
Program ContactCathy Satterfield What's NewSign Retroreflectivity Toolkit Sign Upgrade Guide Specification Publications |