Longitudinal Barriers

Longitudinal Barriers and Miscellaneous Items

Recently posted Acceptance Letters are marked with an asterisk (*).

Revised Thursday, March 19, 2009

Code Date 350/Mash Manufacturer Device Description View PDF Text Version
B-190 3/31/2008 Bexar Concrete CTB with Quick Bolt Connection View PDF acceptance letter on CTB with Quick Bolt Connection (PDF, 209 KB). (209 KB) No Text version is available
B-185 12/8/2008 350 NUCOR Steel Marion NU-Guard 27 -- varying w-beam heights View PDF acceptance letter on NU-Guard 27 -- varying w-beam heights (PDF, 57.3 KB). (57.3 KB) No Text version is available
B-184 12/9/2008 350 NUCOR Steel Marion NU-Cable -- New Hanger for TL-4 View PDF acceptance letter on NU-Cable -- New Hanger for TL-4 (PDF, 217 KB). (217 KB) No Text version is available
B-183 11/26/2008 350 NUCOR Steel Marion NU Cable -- plastic or steel sockets View PDF acceptance letter on NU Cable -- plastic or steel sockets (PDF, 229 KB). (229 KB) View Text acceptance letter on NU Cable -- plastic or steel sockets.
B-182 11/14/2008 350 MWRSF Concrete Median Barrier meeting head ejection criteria View PDF acceptance letter on Concrete Median Barrier meeting head ejection criteria (PDF, 1.10 MB). (1.10 MB) No Text version is available
B-181 7/28/2008 350 Western Federal Lands Random Rubble Cavity Wall -- Aesthetic Barrier View PDF acceptance letter on Random Rubble Cavity Wall -- Aesthetic Barrier (PDF, 1.05 MB). (1.05 MB) No Text version is available
B-180 9/8/2008 MWRSF CMB Tiedowns and Transitions View PDF acceptance letter on CMB Tiedowns and Transitions (PDF, 2.25 MB). (2.25 MB) No Text version is available
B-179 7/11/2008 350 Energy Absorption, Inc TL-1 Triton Water Filled Barrier View PDF acceptance letter on TL-1 Triton Water Filled Barrier (PDF, 398 KB). (398 KB) View Text acceptance letter on TL-1 Triton Water Filled Barrier.
B-178 6/5/2008 350 Mobile Barriers, LLC Mobile Barrier Trailer Portable WZ barrier TL2 too View PDF acceptance letter on Mobile Barrier Trailer Portable WZ barrier TL2 too (PDF, 2.38 MB). (2.38 MB) View Text acceptance letter on Mobile Barrier Trailer Portable WZ barrier TL2 too.
B-177 7/16/2008 350 Trinity Industries Trinity Guardrail Systems (T-31 and T-39 in both US and SI panels and post spacings.) View PDF acceptance letter on Trinity Guardrail Systems (T-31 and T-39 in both US and SI panels and post spacings.) (PDF, 826 KB). (826 KB) View Text acceptance letter on Trinity Guardrail Systems (T-31 and T-39 in both US and SI panels and post spacings.).
B-176A 7/17/2008 MASH Hill and Smith Zoneguard MASH View PDF acceptance letter on Zoneguard MASH (PDF, 361 KB). (361 KB) View Text acceptance letter on Zoneguard MASH.
B-176 6/27/2008 350 Hill and Smith Zonguard portable steel barrier View PDF acceptance letter on Zonguard portable steel barrier (PDF, 138 KB). (138 KB) View Text acceptance letter on Zonguard portable steel barrier.
B-175 6/28/2008 350 MWRSF MGS with round DougFir, PonderosaPine, SYPine View PDF acceptance letter on MGS with round DougFir, PonderosaPine, SYPine (PDF, 1.26 MB). (1.26 MB) View Text acceptance letter on MGS with round DougFir, PonderosaPine, SYPine.
B-174 4/16/2008 350 Monroeville Industrial Molding Composite blockouts 6” and 12” View PDF acceptance letter on Composite blockouts 6” and 12” (PDF, 592 KB). (592 KB) View Text acceptance letter on Composite blockouts 6” and 12”.
B-173 3/28/2008 350 Barrier Systems, Inc. ArmorGuard Barrier (Formrely SafeGuard) View PDF acceptance letter on ArmorGuard Barrier (Formrely SafeGuard) (PDF, 3.94 MB). (3.94 MB) View Text acceptance letter on ArmorGuard Barrier (Formrely SafeGuard).
B-171 4/16/2008 350 Colorado DOT F-Shaped CMB View PDF acceptance letter on F-Shaped CMB (PDF, 524 KB). (524 KB) View Text acceptance letter on F-Shaped CMB.
B-170 4/22/2008 350 South Carolina DOT Anchorage for precast barriers View PDF acceptance letter on Anchorage for precast barriers (PDF, 71.4 KB). (71.4 KB) View Text acceptance letter on Anchorage for precast barriers.
B-169 1/24/2008 350 Easi-Set Industries JJ Hooks on 20 ft Kentucky CMB View PDF acceptance letter on JJ Hooks on 20 ft Kentucky CMB (PDF, 59.8 KB). (59.8 KB) View Text acceptance letter on JJ Hooks on 20 ft Kentucky CMB.
B-168 2/2/2008 350 Mac Ray MassHighways Annisquam River Bridge Rail View PDF acceptance letter on Annisquam River Bridge Rail (PDF, 195 KB). (195 KB) View Text acceptance letter on Annisquam River Bridge Rail.
B-167 2/24/2008 350 Nucor Steel Four-cable Nucor Wire Rope Barrier System TL-4 View PDF acceptance letter on Four-cable Nucor Wire Rope Barrier System TL-4 (PDF, 368 KB). (368 KB) View Text acceptance letter on Four-cable Nucor Wire Rope Barrier System TL-4.
B-166 12/21/2007 350 Anro Products Inc. Omni products, guardrail plastic spacer block View PDF acceptance letter on Omni products, guardrail plastic spacer block (PDF, 266 KB). (266 KB) View Text acceptance letter on Omni products, guardrail plastic spacer block.
B-164 10/30/2007 350 Barrier Connection LLC F-Shape portable concrete barrier wall View PDF acceptance letter on F-Shape portable concrete barrier wall (PDF, 513 KB). (513 KB) View Text acceptance letter on F-Shape portable concrete barrier wall.
B-163 8/30/2007 350 S.I. Story Lumber Co. TimBarrier StreetGuard Plus View PDF acceptance letter on TimBarrier StreetGuard Plus (PDF, 709 KB). (709 KB) View Text acceptance letter on TimBarrier StreetGuard Plus.
B-162B 6/27/2008 350 NUCOR MARION Steel N/A View PDF acceptance letter on N/A (PDF, 393 KB). (393 KB) View Text acceptance letter on N/A.
B-162 9/11/2007 350 Nucor Marion 31” Nucor steel strong post 31” guardrail system View PDF acceptance letter on  31” Nucor steel strong post 31” guardrail system (PDF, 545 KB). (545 KB) View Text acceptance letter on  31” Nucor steel strong post 31” guardrail system.
B-161 7/3/2007 350 NYSDOT Generic 4-strand cable barrier system View PDF acceptance letter on Generic 4-strand cable barrier system (PDF, 849 KB). (849 KB) View Text acceptance letter on Generic 4-strand cable barrier system.
B-160 5/8/2007 350 Barrier Systems BarrierGuard 800 (Variable Length Barrier) View PDF acceptance letter on BarrierGuard 800 (Variable Length Barrier) (PDF, 0.98 MB). (0.98 MB) View Text acceptance letter on BarrierGuard 800 (Variable Length Barrier).
B-159 5/8/2007 350 Barrier Systems BarrierGuard 800 (Gate of Hwy. Care) View PDF acceptance letter on BarrierGuard 800 (Gate of Hwy. Care) (PDF, 987 KB). (987 KB) View Text acceptance letter on BarrierGuard 800 (Gate of Hwy. Care).
B-158 5/8/2007 350 Barrier Systems BarrierGuard 800 (minimum deflection system) View PDF acceptance letter on BarrierGuard 800 (minimum deflection system) (PDF, 2.25 MB). (2.25 MB) View Text acceptance letter on BarrierGuard 800 (minimum deflection system).
B-157 4/23/2007 350 Trinity Highway Products CASS TL-4 Cable Barrier system & terminal View PDF acceptance letter on CASS TL-4 Cable Barrier system & terminal (PDF, 617 KB). (617 KB) View Text acceptance letter on CASS TL-4 Cable Barrier system & terminal.
B-156 3/21/2007 350 Gregory Industries Inc. GMS-TB Guardrail System View PDF acceptance letter on GMS-TB Guardrail System (PDF, 2.06 Mb). (2.06 Mb) View Text acceptance letter on GMS-TB Guardrail System.
B-155 3/8/2007 350 Corpacero HDPE Spacer Block, TL-3 View PDF acceptance letter on HDPE Spacer Block, TL-3 (PDF, 366 KB). (366 KB) View Text acceptance letter on HDPE Spacer Block, TL-3.
B-154 1/23/2007 350 Perini Corporation ESB Safety-shape Steel Bridge Rail View PDF acceptance letter on ESB Safety-shape Steel Bridge Rail (PDF, 516 KB). (516 KB) View Text acceptance letter on ESB Safety-shape Steel Bridge Rail.
B-153 1/17/2007 350 David Hubbell Aesthetic weak-post timber rail View PDF acceptance letter on Aesthetic weak-post timber rail (PDF, 1.92 MB). (1.92 MB) View Text acceptance letter on Aesthetic weak-post timber rail.
B-152 3/27/2008 350 Permatile Concrete Prod [Mis labeled as B-151] Revision of FHWA acceptance to Include shorter segments of TCB View PDF acceptance letter on Revision of FHWA acceptance to Include shorter segments of TCB (PDF, 1.52 MB). (1.52 MB) View Text acceptance letter on Revision of FHWA acceptance to Include shorter segments of TCB.
B-151 11/21/2006 Wyoming DOT W-beam to thrie beam transitions to thrie beam transitions View PDF acceptance letter on W-beam to thrie beam transitions
to thrie beam transitions (PDF, 1.23 MB). (1.23 MB) View Text acceptance letter on W-beam to thrie beam transitions
to thrie beam transitions.
B-150B 7/16/2008 350 Gregory Highway Products GMS Barrier with 12 ft 6 inch post spacing View PDF acceptance letter on GMS Barrier with 12 ft 6 inch post spacing (PDF, 134 KB). (134 KB) View Text acceptance letter on GMS Barrier with 12 ft 6 inch post spacing.
B-150A 3/26/2008 Mash Gregory Highway Products GMS roadside and median Guardrail to MASH08 View PDF acceptance letter on GMS roadside and median Guardrail to MASH08 (PDF, 1.35 MB). (1.35 MB) View Text acceptance letter on GMS roadside and median Guardrail to MASH08.
B-150 10/27/2006 Gregory Highway Products Gregory Mini-Spacer (GMS) for W-beam guardrail View PDF acceptance letter on Gregory Mini-Spacer (GMS) for W-beam guardrail (PDF, 202 KB). (202 KB) View Text acceptance letter on Gregory Mini-Spacer (GMS) for W-beam guardrail.
B-149 5/19/2006 Battelle Memorial Institute 50-inch tall NJ barrier @ TL-3 View PDF acceptance letter on 50-inch tall NJ barrier @ TL-3 (PDF, 1.76 MB). (1.76 MB) View Text acceptance letter on 50-inch tall NJ barrier @ TL-3.
B-148 6/2/2006 Trinity T-39 Thrie-beam guardrail @ TL-4 View PDF acceptance letter on T-39 Thrie-beam guardrail @ TL-4 (PDF, 1.99 MB). (1.99 MB) View Text acceptance letter on T-39 Thrie-beam guardrail @ TL-4.
B-147A 6/16/2006 Gibraltar Gibraltar cable to W-beam transition View PDF acceptance letter on Gibraltar cable to W-beam transition (PDF, 229 KB). (229 KB) View Text acceptance letter on Gibraltar cable to W-beam transition.
B-147 5/8/2006 Various Cable to Metal-beam guardrail transitions View PDF acceptance letter on Cable to Metal-beam guardrail transitions (PDF, 1.39 MB). (1.39 MB) View Text acceptance letter on Cable to Metal-beam guardrail transitions.
B-146 7/17/2008 350 New England Transp. Consort. Transitions for 3 NETC bridge rails View PDF acceptance letter on Transitions for 3 NETC bridge rails (PDF, 5.07 MB). (5.07 MB) View Text acceptance letter on Transitions for 3 NETC bridge rails.
B145 4/6/2006 Nebraska Department of Roads Test Level 5 (TL- 5) Bridge Rail View PDF acceptance letter on Test Level 5 (TL- 5) Bridge Rail (PDF, 0.98 MB). (0.98 MB) View Text acceptance letter on Test Level 5 (TL- 5) Bridge Rail.
B-144 3/10/2006 LifeNet Softwalls, LLC Recyled Tire Barrier View PDF acceptance letter on Recyled Tire Barrier (PDF, 1.69 MB). (1.69 MB) View Text acceptance letter on Recyled Tire Barrier.
B-143 2/9/2006 Wyoming DOT Box-beam transition to concrete View PDF acceptance letter on Box-beam transition to concrete (PDF, 503 KB). (503 KB) View Text acceptance letter on Box-beam transition to concrete.
B-142 1/12/2006 Composite Structural Design, LLC Steel roadside barrier @ TL-5 (Max-Rail) View PDF acceptance letter on Steel roadside barrier @ TL-5 (Max-Rail) (PDF, 604 KB). (604 KB) View Text acceptance letter on Steel roadside barrier @ TL-5 (Max-Rail).
B-141E* 2/20/2009 350 Trinity Industries CASS with C-Channel posts View PDF acceptance letter on CASS with C-Channel posts (PDF, 1.24 MB). (1.24 MB) View Text acceptance letter on CASS with C-Channel posts.
B-141D 3/19/2009 350 Trinity Industries CASS of 141C on 6:1 slopes or flatter View PDF acceptance letter on CASS of 141C on 6:1 slopes or flatter (PDF, 1.25 MB). (1.25 MB) View Text acceptance letter on CASS of 141C on 6:1 slopes or flatter.
B-141C 11/14/2008 350 Trinity Industries CASS on 4:1 slope to 350 REVISED View PDF acceptance letter on CASS on 4:1 slope to 350 REVISED (PDF, 51 KB). (51 KB) View Text acceptance letter on CASS on 4:1 slope to 350 REVISED.
B-141B 5/8/2006 Trinity TL-3 CASS w/ 32.5-foot post spacing View PDF acceptance letter on TL-3 CASS w/ 32.5-foot post spacing (PDF, 711 KB). (711 KB) View Text acceptance letter on TL-3 CASS w/ 32.5-foot post spacing.
B-141A 5/2/2006 Trinity TL-3 CASS w/ driven posts at 20-foot spacing View PDF acceptance letter on TL-3 CASS w/ driven posts at 20-foot spacing (PDF, 70 KB). (70 KB) View Text acceptance letter on TL-3 CASS w/ driven posts at 20-foot spacing.
B-141 11/17/2005 Trinity Highway Safety Products, Inc. CASS TL-3 and CAS TL-4 I-post designs View PDF acceptance letter on CASS TL-3 and CAS TL-4 I-post designs (PDF, 824 KB). (824 KB) View Text acceptance letter on CASS TL-3 and CAS TL-4 I-post designs.
B-140 11/3/2005 Trinity Highway Safety Products Division T-31 Strong-post W-beam @ TL-3 View PDF acceptance letter on T-31 Strong-post W-beam @ TL-3 (PDF, 1.02 MB). (1.02 MB) View Text acceptance letter on T-31 Strong-post W-beam @ TL-3.
B-139 8/10/2005 Battelle Memorial Institute Ohio TL-3 W-beam rail and transition View PDF acceptance letter on Ohio TL-3 W-beam rail and transition (PDF, 669 KB). (669 KB) View Text acceptance letter on Ohio TL-3 W-beam rail and transition.
B-138 8/4/2005 Midwest Roadside Safety Facility TL-2 & TL-4 railings/transistions for timber bridge decks View PDF acceptance letter on TL-2 & TL-4 railings/transistions for timber bridge decks (PDF, 432 KB). (432 KB) View Text acceptance letter on TL-2 & TL-4 railings/transistions for timber bridge decks.
B-137D 2/8/2008 350 Gibraltar Four point anchorage to 4 cable barrier View PDF acceptance letter on Four point anchorage to 4 cable barrier (PDF, 488 KB). (488 KB) View Text acceptance letter on Four point anchorage to 4 cable barrier.
B-137C (HSSD) 1/8/2008 350 Gibraltar Revised anchor design (4 archors) View PDF acceptance letter on Revised anchor design (4 archors) (PDF, 7.99 KB). (7.99 KB) View Text acceptance letter on Revised anchor design (4 archors).
B-137C (HSA) 7/12/2006 350 Gibraltar 4:1 Slope View PDF acceptance letter on 4:1 Slope (PDF, 308 KB). (308 KB) View Text acceptance letter on 4:1 Slope.
B-137B 4/3/2006 Gibraltar Alternative Post Spacings View PDF acceptance letter on Alternative Post Spacings (PDF, 695 KB). (695 KB) View Text acceptance letter on Alternative Post Spacings.
B-137A1 10/27/2006 Gibraltar 4-cable barrier @ TL-4 View PDF acceptance letter on 4-cable barrier @ TL-4 (PDF, 36 KB). (36 KB) View Text acceptance letter on 4-cable barrier @ TL-4.
B-137A 7/13/2005 Gibraltar Gibraltar cable barrier @ TL-4 View PDF acceptance letter on Gibraltar cable barrier @ TL-4 (PDF, 245 KB). (245 KB) View Text acceptance letter on Gibraltar cable barrier @ TL-4.
B-137 6/13/2005 Gibraltar Gibraltar cable barrier @ TL-3 View PDF acceptance letter on Gibraltar cable barrier @ TL-3 (PDF, 241 KB). (241 KB) View Text acceptance letter on Gibraltar cable barrier @ TL-3.
B-136 5/18/2005 CYRO Industries, Inc. PARAGLAS noisewall on TL-4 concrete barrier View PDF acceptance letter on PARAGLAS noisewall on TL-4 concrete barrier (PDF, 1.26 MB). (1.26 MB) View Text acceptance letter on PARAGLAS noisewall on TL-4 concrete barrier.
B-135 5/26/2005 Midwest Roadside Safety Facility TL-3 timber rubrail for MnDOT noise wall View PDF acceptance letter on TL-3 timber rubrail for MnDOT noise wall (PDF, 427 KB). (427 KB) View Text acceptance letter on TL-3 timber rubrail for MnDOT noise wall.
B-134D 8/29/2008 350 Energy Absorption, Inc. TL-4 Vulcan View PDF acceptance letter on TL-4 Vulcan (PDF, 11.4 KB). (11.4 KB) View Text acceptance letter on TL-4 Vulcan.
B-134C 11/21/2007 350 Energy Absorption Systems 12 M Vulcan View PDF acceptance letter on 12 M Vulcan (PDF, 3.43 MB). (3.43 MB) View Text acceptance letter on 12 M Vulcan.
B-134A 11/17/2005 Energy Absorption Systems, Incorporated Transition designs for Vulcan barrier View PDF acceptance letter on Transition designs for Vulcan barrier (PDF, 476 KB). (476 KB) View Text acceptance letter on Transition designs for Vulcan barrier.
B-134 2/14/2005 Energy Absorption Systems, Inc. Vulcan temporary steel barrier at TL-3 View PDF acceptance letter on Vulcan temporary steel barrier at TL-3 (PDF, 983 KB). (983 KB) View Text acceptance letter on Vulcan temporary steel barrier at TL-3.
B-133 3/1/2005 Midwest Roadside Safety Facility Midwest Guardrail System (MGS) View PDF acceptance letter on Midwest Guardrail System (MGS) (PDF, 1590 KB). (1590 KB) View Text acceptance letter on Midwest Guardrail System (MGS).
B-132 12/28/2004 Valentine & Company Aluminum truss-core F-shape Bridge Rail View PDF acceptance letter on Aluminum truss-core F-shape Bridge Rail (PDF, 1.32 MB). (1.32 MB) View Text acceptance letter on Aluminum truss-core F-shape Bridge Rail.
B-131 11/30/2004 Barrier Systems, Inc. BarrierGuard 800 temporary steel barrier @ TL-4 View PDF acceptance letter on BarrierGuard 800 temporary steel barrier @ TL-4 (PDF, 553 KB). (553 KB) View Text acceptance letter on BarrierGuard 800 temporary steel barrier @ TL-4.
B-130 11/30/2004 TrafFix Devices, Inc TrafFix Water Wall water-filled plastic barrier @ TL-1 View PDF acceptance letter on TrafFix Water Wall water-filled plastic barrier @ TL-1 (PDF, 179.KB). (179.KB) View Text acceptance letter on TrafFix Water Wall water-filled plastic barrier @ TL-1.
B-129 11/1/2004 Barriers USA, Inc. Guardliner water-filled plastic barrier w/W-beam @ TL-2 View PDF acceptance letter on Guardliner water-filled plastic barrier w/W-beam @ TL-2 (PDF, 584 KB). (584 KB) View Text acceptance letter on Guardliner water-filled plastic barrier w/W-beam @ TL-2.
B-128 8/24/2004 CalTrans ST20S steel post & beam bridge rail @ TL-4 View PDF acceptance letter on ST20S steel post & beam bridge rail @ TL-4 (PDF, 873 KB). (873 KB) View Text acceptance letter on ST20S steel post & beam bridge rail @ TL-4.
B-127 6/18/2004 NYSDOT TL-4 box-beam transition designs View PDF acceptance letter on TL-4 box-beam transition designs (PDF, 100 KB). (100 KB) View Text acceptance letter on TL-4 box-beam transition designs.
B-126 3/30/2004 Nebraska Department of Roads Concrete Post & Beam Railing @ TL-4 View PDF acceptance letter on Concrete Post & Beam Railing @ TL-4 (PDF, 576 KB). (576 KB) View Text acceptance letter on Concrete Post & Beam Railing @ TL-4.
B-125 3/19/2004 Safety Barriers, Inc. SB-1-TL water-filled barrier @ TL-3 View PDF acceptance letter on SB-1-TL water-filled barrier @ TL-3 (PDF, 843 KB). (843 KB) View Text acceptance letter on SB-1-TL water-filled barrier @ TL-3.
B-124 12/9/2003 Creative Pultrusions,Inc. Composite Thrie-beam (SuperRail) @ TL-3 View PDF acceptance letter on Composite Thrie-beam (SuperRail) @ TL-3 (PDF, 1.06mb). (1.06mb) View Text acceptance letter on Composite Thrie-beam (SuperRail) @ TL-3.
B-123 3/12/2004 Composite Structural Design, LLC Temporary steel bridge rail @ TL-5 View PDF acceptance letter on Temporary steel bridge rail @ TL-5 (PDF, 134 KB). (134 KB) View Text acceptance letter on Temporary steel bridge rail @ TL-5.
B-122 10/2/2003 Midwest Roadside Safety Facility Bolt-down System for F-shape on bridge deck @ TL-3 View PDF acceptance letter on Bolt-down System for F-shape on bridge deck @ TL-3 (PDF, 1.44mb). (1.44mb) View Text acceptance letter on Bolt-down System for F-shape on bridge deck @ TL-3.
B-121 7/28/2003 Oregon Department of Transportation Oregon 2-tube ped/bike rail @ TL-4 View PDF acceptance letter on Oregon 2-tube ped/bike rail @ TL-4 (PDF, 128 Kb). (128 Kb) View Text acceptance letter on Oregon 2-tube ped/bike rail @ TL-4.
B-120 5/19/2003 Midwestern Wholesalers, Inc. narrow wood offset block View PDF acceptance letter on narrow wood offset block (PDF, 100 Kb). (100 Kb) View Text acceptance letter on narrow wood offset block.
B-119B 8/28/2003 Trinity Highway Safety Products Division 3-cable rail (posts on 2-m centers) @ TL-3 View PDF acceptance letter on 3-cable rail (posts on 2-m centers) @ TL-3 (PDF, 21kb). (21kb) View Text acceptance letter on 3-cable rail (posts on 2-m centers) @ TL-3.
B-119A 5/15/2003 Trinity Industries 3-cable rail (posts on 5-m centers) @ TL-3 View PDF acceptance letter on 3-cable rail (posts on 5-m centers) @ TL-3 (PDF, 287Kb). (287Kb) View Text acceptance letter on 3-cable rail (posts on 5-m centers) @ TL-3.
B-119 5/13/2003 Trinity Industries 3-cable rail (posts on 3-m centers) @ TL-3 View PDF acceptance letter on 3-cable rail (posts on 3-m centers) @ TL-3 (PDF, 298Kb). (298Kb) View Text acceptance letter on 3-cable rail (posts on 3-m centers) @ TL-3.
B-118 4/22/2003 Oregon DOT 3-Tube Bridge Rail @TL-4 View PDF acceptance letter on 3-Tube Bridge Rail @TL-4 (PDF, 355Kb). (355Kb) View Text acceptance letter on 3-Tube Bridge Rail @TL-4.
B-117 9/12/2003 University of Nebraska - Lincoln Steel H-section Barrier for temporary use on Bridge Decks View PDF acceptance letter on Steel H-section Barrier for temporary use on Bridge Decks (PDF, 505kb). (505kb) View Text acceptance letter on Steel H-section Barrier for temporary use on Bridge Decks.
B-116 3/27/2003 Midwest Roadside Safety Facility low concrete bridge rail @ TL-2 View PDF acceptance letter on low concrete bridge rail @ TL-2 (PDF, 70 Kb). (70 Kb) View Text acceptance letter on low concrete bridge rail @ TL-2.
B-115 8/12/2003 University of Florida FDOT Portable Concrete Curb @ TL-2 View PDF acceptance letter on FDOT Portable Concrete Curb @ TL-2 (PDF, 96 Kb). (96 Kb) View Text acceptance letter on FDOT Portable Concrete Curb @ TL-2.
B-114 3/27/2003 Welch Products, Inc. recycled rubber offset block View PDF acceptance letter on recycled rubber offset block (PDF, 58 Kb). (58 Kb) View Text acceptance letter on recycled rubber offset block.
B-113 7/10/2003 REMCON Plastics Incorporated Water-filled Longitudinal Barrier @ TL-2 View PDF acceptance letter on Water-filled Longitudinal Barrier @ TL-2 (PDF, 307kb). (307kb) View Text acceptance letter on Water-filled Longitudinal Barrier @ TL-2.
B-112 3/14/2003 Midwest Roadside Safety Facility Steel strap tie-down system for PCB on bridge decks @ TL-3 View PDF acceptance letter on Steel strap tie-down system for PCB on bridge decks @ TL-3 (PDF, 55 Kb). (55 Kb) View Text acceptance letter on Steel strap tie-down system for PCB on bridge decks @ TL-3.
B-111 2/11/2003 Creative Building Products Water Filled Plastic Barrier @ TL-2 View PDF acceptance letter on Water Filled Plastic Barrier @ TL-2 (PDF, 394 Kb). (394 Kb) View Text acceptance letter on Water Filled Plastic Barrier @ TL-2.
B-110 12/20/2002 Caltrans Materials Engineering and Testing Services Texture Guidelines for SS and Vertical Concrete Barriers View PDF acceptance letter on Texture Guidelines for SS and Vertical Concrete Barriers (PDF, 929 Kb). (929 Kb) View Text acceptance letter on Texture Guidelines for SS and Vertical Concrete Barriers.
B-109B 3/17/2004 Burkett Molding, Inc. Modified plastic block (P-Block) for use w/ strong post guardrail View PDF acceptance letter on Modified plastic block (P-Block) for use w/ strong post guardrail (PDF, 183 KB). (183 KB) View Text acceptance letter on Modified plastic block (P-Block) for use w/ strong post guardrail.
B-109A 8/29/2003 Interstate Timber Products Co. Recycled Plastic Block for Strong Round-Post W-beam Guardrail View PDF acceptance letter on Recycled Plastic Block for Strong Round-Post W-beam Guardrail (PDF, 42.2kb). (42.2kb) View Text acceptance letter on Recycled Plastic Block for Strong Round-Post W-beam Guardrail.
B-109 11/7/2002 Interstate Timber Products Co. Plastic block for strong-post w-beam View PDF acceptance letter on Plastic block for strong-post w-beam (PDF, 72 Kb). (72 Kb) View Text acceptance letter on Plastic block for strong-post w-beam.
B-108 11/4/2002 Barrier Systems, Inc. Temporary steel barrier @ TL-2/TL-3 View PDF acceptance letter on Temporary steel barrier @ TL-2/TL-3 (PDF, 5.2 Mb). (5.2 Mb) View Text acceptance letter on Temporary steel barrier @ TL-2/TL-3.
B-107 9/5/2003 ANRO Timber Products, Incorporated Recycled Plastic Blockout for TL-3 W-beam Guardian View PDF acceptance letter on Recycled Plastic Blockout for TL-3 W-beam Guardian (PDF, 28.4kb). (28.4kb) View Text acceptance letter on Recycled Plastic Blockout for TL-3 W-beam Guardian.
B-106 9/5/2002 Caltrans Thrie-beam transition @TL-4 View PDF acceptance letter on Thrie-beam transition @TL-4 (PDF, 376 Kb). (376 Kb) View Text acceptance letter on Thrie-beam transition @TL-4.
B-105 9/5/2002 Nebraska Department of Roads Thrie-beam transition @ TL-3 View PDF acceptance letter on Thrie-beam transition @ TL-3 (PDF, 854 Kb). (854 Kb) View Text acceptance letter on Thrie-beam transition @ TL-3.
B-104 7/17/2002 Pennsylvania Department of Transportation Concrete parapet w/steel rail @ TL-5 View PDF acceptance letter on Concrete parapet w/steel rail @ TL-5 (PDF, 41 Kb). (41 Kb) View Text acceptance letter on Concrete parapet w/steel rail @ TL-5.
B-103 7/1/2002 Project Back to EDEN Recycled Rubber Blockout View PDF acceptance letter on Recycled Rubber Blockout (PDF, 91 Kb). (91 Kb) View Text acceptance letter on Recycled Rubber Blockout.
B-102 7/3/2002 John Carlo, Inc. Conditional Acceptance: 20' NJ-shape TCB @ TL-3 View PDF acceptance letter on Conditional Acceptance: 20' NJ-shape TCB @ TL-3 (PDF, 112 Kb). (112 Kb) View Text acceptance letter on Conditional Acceptance: 20' NJ-shape TCB @ TL-3.
B-101 7/1/2002 Rhino Safety Barrier LLC Water-filled Plastic Barrier @ TL-2 View PDF acceptance letter on Water-filled Plastic Barrier @ TL-2 (PDF, 492 Kb). (492 Kb) View Text acceptance letter on Water-filled Plastic Barrier @ TL-2.
B-100 7/1/2002 Eco-Composites, LLC Eco-Composites plastic offset block View PDF acceptance letter on Eco-Composites plastic offset block (PDF, 416 Kb). (416 Kb) View Text acceptance letter on Eco-Composites plastic offset block.
B-99 4/30/2002 Ohio Department of Transportation Thrie-beam transition to vert. conc. parapet@TL-4 View PDF acceptance letter on Thrie-beam transition to vert. conc. parapet@TL-4 (PDF, 354 Kb). (354 Kb) View Text acceptance letter on Thrie-beam transition to vert. conc. parapet@TL-4.
B-98 5/10/2002 North Carolina Department of Transportation 10-ft NJ barrier w/ triple loops and drop-in pin @ TL-3 View PDF acceptance letter on 10-ft NJ barrier w/ triple loops and drop-in pin @ TL-3 (PDF, 275 Kb). (275 Kb) View Text acceptance letter on 10-ft NJ barrier w/ triple loops and drop-in pin @ TL-3.
B-97A 4/14/2008 350 Yodock Wall Co., Inc. Modified Side Rail Support View PDF acceptance letter on Modified Side Rail Support (PDF, 1.17 MB). (1.17 MB) View Text acceptance letter on Modified Side Rail Support.
B-97 3/27/2002 Yodock Wall Company, Inc. Yodock Model 2001M/2001 Plastic Barriers w/ steel tubes @ TL-2/TL-3 View PDF acceptance letter on Yodock Model 2001M/2001 Plastic Barriers w/ steel tubes @ TL-2/TL-3 (PDF, 1.09 Mb). (1.09 Mb) View Text acceptance letter on Yodock Model 2001M/2001 Plastic Barriers w/ steel tubes @ TL-2/TL-3.
B-96A 10/12/2005 Nucor Steel Marion Inc. Alternative post design View PDF acceptance letter on Alternative post design (PDF, 768 KB). (768 KB) View Text acceptance letter on Alternative post design.
B-96 8/30/2002 Marion Steel Company posts/attachment hardware for 3-strand cable g.r.@TL-3 View PDF acceptance letter on posts/attachment hardware for 3-strand cable g.r.@TL-3 (PDF, 499 Kb). (499 Kb) View Text acceptance letter on posts/attachment hardware for 3-strand cable g.r.@TL-3.
B-95A 4/5/2002 Trinity Industries, Inc. Alternative post orientation allowed View PDF acceptance letter on Alternative post orientation allowed (PDF, 50.2 Kb). (50.2 Kb) View Text acceptance letter on Alternative post orientation allowed.
B-95 2/1/2002 Trinity Industries, Inc. O-Post for W-Beam gr @ TL-3 View PDF acceptance letter on O-Post for W-Beam gr @ TL-3 (PDF, 236 Kb). (236 Kb) View Text acceptance letter on O-Post for W-Beam gr @ TL-3.
B-94 1/24/2002 NY DOT 20-ft NJ barrier w/ I-beam connection @ TL-3 View PDF acceptance letter on 20-ft NJ barrier w/ I-beam connection @ TL-3 (PDF, 53 kb). (53 kb) View Text acceptance letter on 20-ft NJ barrier w/ I-beam connection @ TL-3.
B-93 1/8/2002 OH DOT 10' NJ shape barrier w/ pin and loop connections @ TL-3 View PDF acceptance letter on 10' NJ shape barrier w/ pin and loop connections @ TL-3 (PDF, 174 kb). (174 kb) View Text acceptance letter on 10' NJ shape barrier w/ pin and loop connections @ TL-3.
B-92A 7/1/2002 Imperial Laminators Glu-lam Posts/Offset Block Dimensions @ TL-3 View PDF acceptance letter on Glu-lam Posts/Offset Block Dimensions @ TL-3 (PDF, 56 Kb). (56 Kb) View Text acceptance letter on Glu-lam Posts/Offset Block Dimensions @ TL-3.
B-92 11/21/2001 Imperial Laminators glu-lam posts and block for w-beam @TL-3 View PDF acceptance letter on glu-lam posts and block for w-beam @TL-3 (PDF, 52 kb). (52 kb) View Text acceptance letter on glu-lam posts and block for w-beam @TL-3.
B-91 11/15/2001 Aeolian Enterprises, Inc. Aeolian recycled plastic block @ TL-3 View PDF acceptance letter on Aeolian recycled plastic block @ TL-3 (PDF, 50 kb). (50 kb) View Text acceptance letter on Aeolian recycled plastic block @ TL-3.
B-90 8/24/2001 CalTrans 4-m long single-slope barrier with double pin&loop connection @ TL-3 View PDF acceptance letter on 4-m long single-slope barrier with double pin&loop connection @ TL-3 (PDF, 7 kb). (7 kb) View Text acceptance letter on 4-m long single-slope barrier with double pin&loop connection @ TL-3.
B-89 8/14/2001 Bijan Kasraie, Consolidated Tire Corporation Akamite Recycled Tire Blockout @ TL-3 View PDF acceptance letter on Akamite Recycled Tire Blockout @ TL-3 (PDF, 70 kb). (70 kb) View Text acceptance letter on Akamite Recycled Tire Blockout @ TL-3.
B-88F 12/23/2008 350 Blue Systems / Safence On 1:4 sloped median MASH-08 View PDF acceptance letter on On 1:4 sloped median	MASH-08 (PDF, 836 KB). (836 KB) View Text acceptance letter on On 1:4 sloped median	MASH-08.
B-88E 7/31/2007 350 Safence TL-4 four cable tensioned barrier View PDF acceptance letter on TL-4 four cable tensioned barrier (PDF, 728 KB). (728 KB) View Text acceptance letter on TL-4 four cable tensioned barrier.
B-88D 12/27/2006 Safence 3-strand wire rope @ TL-4 View PDF acceptance letter on 3-strand wire rope @ TL-4 (PDF, 633 KB). (633 KB) View Text acceptance letter on 3-strand wire rope @ TL-4.
B-88C 5/26/2005 Safence, Incorporated alternative post (C-post) design View PDF acceptance letter on alternative post (C-post) design (PDF, 54 KB). (54 KB) View Text acceptance letter on alternative post (C-post) design.
B-88B 6/8/2004 Blue Systems AB Alternative post spacing/embedment design View PDF acceptance letter on Alternative post spacing/embedment design (PDF, 70.KB). (70.KB) View Text acceptance letter on Alternative post spacing/embedment design.
B-88A 1/28/2004 Safence, Incorporated 4-cable median barrier @ TL-3. (Blue Systems AB) View PDF acceptance letter on 4-cable median barrier @ TL-3. (Blue Systems AB) (PDF, 324 KB). (324 KB) View Text acceptance letter on 4-cable median barrier @ TL-3. (Blue Systems AB).
B-88 7/13/2001 Mats Heinevik, Blue Systems, AB Safence 350 Wire Rope Barrier @ TL3 View PDF acceptance letter on Safence 350 Wire Rope Barrier @ TL3 (PDF, 314 kb). (314 kb) View Text acceptance letter on Safence 350 Wire Rope Barrier @ TL3.
B-87 7/6/2001 James R. Keaton, Barrier Systems, Inc. SafeGuard Gate System (SGS) @ TL-3 View PDF acceptance letter on SafeGuard Gate System (SGS) @ TL-3 (PDF, 932 kb). (932 kb) View Text acceptance letter on SafeGuard Gate System (SGS) @ TL-3.
B-86A 11/21/2001 OR DOT 42-inch tall F-shape @ TL-4 View PDF acceptance letter on 42-inch tall F-shape @ TL-4 (PDF, 69 kb). (69 kb) View Text acceptance letter on 42-inch tall F-shape @ TL-4.
B-86 8/17/2001 Daniel J. MacDonald, Oregon DOT 12.5 ft F-shape precast concrete barrier w/a pin and loop connection @ TL-3 View PDF acceptance letter on 12.5 ft F-shape precast concrete barrier w/a pin and loop connection @ TL-3 (PDF, 529 kb). (529 kb) View Text acceptance letter on 12.5 ft F-shape precast concrete barrier w/a pin and loop connection @ TL-3.
B-85E 5/8/2007 350 Trinity Highway Products Modified King Block View PDF acceptance letter on Modified King Block (PDF, 450 KB). (450 KB) View Text acceptance letter on Modified King Block.
B-85D 3/22/2006 Trinity Modified King Block View PDF acceptance letter on Modified King Block (PDF, 269 KB). (269 KB) View Text acceptance letter on Modified King Block.
B-85B 8/28/2002 TRINITY Industries Modification to KING block View PDF acceptance letter on Modification to KING block (PDF, 40 Kb). (40 Kb) View Text acceptance letter on Modification to KING block.
B-85A 7/10/2001 Rodney A. Boyd, Trinity Industries, Inc King Recycled Composite Guardrail offset block @ TL-3 View PDF acceptance letter on King Recycled Composite Guardrail offset block @ TL-3 (PDF, 13 kb). (13 kb) View Text acceptance letter on King Recycled Composite Guardrail offset block @ TL-3.
B-85 6/1/2001 Rodney A. Boyd, Trinity Industries King Recycled Composite Guardrail offset block @ TL-3 View PDF acceptance letter on King Recycled Composite Guardrail offset block @ TL-3 (PDF, 59 kb). (59 kb) No Text version is available
B-84 1/24/2002 IN DOT 10-ft F-shape barrier w/pin&loop connection @ TL-3 View PDF acceptance letter on 10-ft F-shape barrier w/pin&loop connection @ TL-3 (PDF, 518 kb). (518 kb) View Text acceptance letter on 10-ft F-shape barrier w/pin&loop connection @ TL-3.
B-83 4/24/2001 Douglas J. Weiszhar, Minnesota DOT MN W-beam Transition @ TL-3 View PDF acceptance letter on MN W-beam Transition @ TL-3 (PDF, 8 kb). (8 kb) No Text version is available
B-82C1 4/13/2006 Hill & Smith Ltd. Shorter Length 3-cable WRSF @ TL-3 View PDF acceptance letter on Shorter Length 3-cable WRSF @ TL-3 (PDF, 39 KB). (39 KB) View Text acceptance letter on Shorter Length 3-cable WRSF @ TL-3.
B-82C 5/26/2005 Hill & Smith Ltd. 3-cable Brifen WRSF @TL-3 View PDF acceptance letter on 3-cable Brifen WRSF @TL-3 (PDF, 162KB). (162KB) View Text acceptance letter on 3-cable Brifen WRSF @TL-3.
B-82B1 5/9/2006 Brifen Brifen WRSF on 1V:4H slope View PDF acceptance letter on Brifen WRSF on 1V:4H slope (PDF, 1.09 MB). (1.09 MB) View Text acceptance letter on Brifen WRSF on 1V:4H slope.
B-82B 3/27/2005 Hill& Smith Ltd. Brifen WRSF @ TL-4 View PDF acceptance letter on Brifen WRSF @ TL-4 (PDF, 858 KB). (858 KB) View Text acceptance letter on Brifen WRSF @ TL-4.
B-82A 2/27/2003 BRIFEN USA, Inc Rescinded "Buy America" provision View PDF acceptance letter on Rescinded "Buy America" provision (PDF, 319 Kb). (319 Kb) View Text acceptance letter on Rescinded "Buy America" provision.
B-82 4/10/2001 Graham Sharp, Brifen Limited Brifen Wire Rope Safety Fence @ TL-3 View PDF acceptance letter on Brifen Wire Rope Safety Fence @ TL-3 (PDF, 319 kb). (319 kb) No Text version is available
B-81A 11/30/2005 Pennsylvania Department of Transportation PA W-Beam Transition @ TL-4 View PDF acceptance letter on PA W-Beam Transition @ TL-4 (PDF, 28.0 KB). (28.0 KB) View Text acceptance letter on PA W-Beam Transition @ TL-4.
B-81 6/26/2001 Michael M. Ryan, PE, PennDOT PA W-beam Transition @ TL-3 View PDF acceptance letter on PA W-beam Transition @ TL-3 (PDF, 7 kb). (7 kb) No Text version is available
B-80C 6/30/2003 HALCO, LLC X44 tubular steel gr post @ TL-3 View PDF acceptance letter on X44 tubular steel gr post @ TL-3 (PDF, 112 Kb). (112 Kb) View Text acceptance letter on X44 tubular steel gr post @ TL-3.
B-80A 9/6/2001 Halco, LLC X40 tubular steel gr post @ TL-3 View PDF acceptance letter on X40 tubular steel gr post  @ TL-3 (PDF, 721 kb). (721 kb) View Text acceptance letter on X40 tubular steel gr post  @ TL-3.
B-80 2/9/2001 David R. Lewis, HALCO, LLC X-48 tubular steel gr post @ TL-3 View PDF acceptance letter on X-48 tubular steel gr post @ TL-3 (PDF, 389 kb). (389 kb) No Text version is available
B-79 12/18/2000 Gary L. Hoffman, Pennsylvania DOT 12.5' F-shape temporary barrier (w/ plate connection) @ TL-3 View PDF acceptance letter on 12.5' F-shape temporary barrier (w/ plate connection) @ TL-3 (PDF, 640 kb). (640 kb) View Text acceptance letter on 12.5' F-shape temporary barrier (w/ plate connection) @ TL-3.
B-78 12/6/2000 Richard Pratt, Alaska DOT AK W-beam Transition View PDF acceptance letter on AK W-beam Transition (PDF, 181 kb). (181 kb) View Text acceptance letter on AK W-beam Transition.
B-77 12/6/2000 Bradley Smith, ConnDOT ConnDOT W-beam Transition @ TL-3 View PDF acceptance letter on ConnDOT W-beam Transition @ TL-3 (PDF, 382 kb). (382 kb) View Text acceptance letter on ConnDOT W-beam Transition @ TL-3.
B-76 12/6/2000 D. Smith-Gander, Amity Plastics Amity Plastic Guardrail Post @ TL-3 View PDF acceptance letter on Amity Plastic Guardrail Post @ TL-3 (PDF, 320 kb). (320 kb) View Text acceptance letter on Amity Plastic Guardrail Post @ TL-3.
B-75 12/21/2000 Kaddo Kothman, Road Systems, Inc. 14-gauge W-beam Guardrail @ TL-3 View PDF acceptance letter on 14-gauge W-beam Guardrail @ TL-3 (PDF, 9 kb). (9 kb) View Text acceptance letter on 14-gauge W-beam Guardrail @ TL-3.
B-74B 2/1/2002 Valley Rubber, LLC Guardrail Block for Round Wood Posts View PDF acceptance letter on Guardrail Block for Round Wood Posts (PDF, 39 Kb). (39 Kb) View Text acceptance letter on Guardrail Block for Round Wood Posts.
B-74A 2/5/2001 Richard Moore, Valley Rubber, LLC Valley Rubber Guardrail Block View PDF acceptance letter on Valley Rubber Guardrail Block (PDF, 245 kb). (245 kb) View Text acceptance letter on Valley Rubber Guardrail Block.
B-74 11/28/2000 Richard Moore, Valley Rubber Valley Rubber Guardrail Block View PDF acceptance letter on Valley Rubber Guardrail Block (PDF, 282 kb). (282 kb) View Text acceptance letter on Valley Rubber Guardrail Block.
B-73 11/8/2000 CME Associates, INC. Stone Cast Aesthetic Barrier Wall @ TL-3 View PDF acceptance letter on Stone Cast Aesthetic Barrier Wall @ TL-3 (PDF, 198 kb). (198 kb) View Text acceptance letter on Stone Cast Aesthetic Barrier Wall @ TL-3.
B-72 11/8/2000 New York State DOT 2-, 4-, and 5-Rail Bridge Railing Designs @ TL-4 View PDF acceptance letter on 2-, 4-, and 5-Rail Bridge Railing Designs @ TL-4 (PDF, 175 kb). (175 kb) View Text acceptance letter on 2-, 4-, and 5-Rail Bridge Railing Designs @ TL-4.
B-71 8/17/2000 James W. Havens, Millennium Plastic Wood, LLC Recycled Plastic Offset Block View PDF acceptance letter on Recycled Plastic Offset Block (PDF, 106 kb). (106 kb) View Text acceptance letter on Recycled Plastic Offset Block.
B-70 7/17/2000 State of Idaho Transportation Department 20ft long NJ barrier (pin and loop connection) View PDF acceptance letter on 20ft long NJ barrier (pin and loop connection) (PDF, 1.83mb). (1.83mb) View Text acceptance letter on 20ft long NJ barrier (pin and loop connection).
B-69C 2/25/2008 350 Barrier Systems Inc. Mod to Variable Length Barrier RTS-QMB View PDF acceptance letter on Mod to Variable Length Barrier RTS-QMB (PDF, 691 KB). (691 KB) View Text acceptance letter on Mod to Variable Length Barrier RTS-QMB.
B-69B 3/22/2005 Barrier Systems, Incorporated limited deflection RTS-QMB View PDF acceptance letter on limited deflection RTS-QMB (PDF, 2083 KB). (2083 KB) View Text acceptance letter on limited deflection RTS-QMB.
B-69A 7/4/2004 Barrier Systems, Incorporated Curved RTS-QMB application View PDF acceptance letter on Curved RTS-QMB application (PDF, 1715 KB). (1715 KB) View Text acceptance letter on Curved RTS-QMB application.
B-69 6/27/2000 Barrier Systems, Inc. Steel Reactive Tension System (SRTS)/Concrete Reactive Tension System (CRTS) View PDF acceptance letter on Steel Reactive Tension System (SRTS)/Concrete Reactive Tension System (CRTS) (PDF, 3.02mb). (3.02mb) No Text version is available
B-68 4/28/2000 CAMMCO, Inc. CAMMCO Plastic Guardrail Blockout View PDF acceptance letter on CAMMCO Plastic Guardrail Blockout (PDF, 592 kb). (592 kb) No Text version is available
B-67 3/30/2000 Georgia Department of Transportation Temporary Concrete Barrier View PDF acceptance letter on Temporary Concrete Barrier (PDF, 793 kb). (793 kb) View Text acceptance letter on Temporary Concrete Barrier.
B-66 2/10/2000 Massachusetts Highway Department Massachusetts Aesthetic Steel Post Bridge Rail View PDF acceptance letter on Massachusetts Aesthetic Steel Post Bridge Rail (PDF, 2268 kb). (2268 kb) No Text version is available
B-65 2/14/2000 FHWA Memo to Resource Centers, etc. Acceptance of W-Beam Transition to a Vertical Concrete Parapet View PDF acceptance letter on Acceptance of W-Beam Transition to a Vertical Concrete Parapet (PDF, 957 kb). (957 kb) No Text version is available
B-64E 3/18/2003 NYSDOT Weak post w-beam median barrier @ TL-3 View PDF acceptance letter on Weak post w-beam median barrier @ TL-3 (PDF, 64 Kb). (64 Kb) View Text acceptance letter on Weak post w-beam median barrier @ TL-3.
B-64D2 2/12/2004 Aesthetic bridge rail, barrier, and transition designs View PDF acceptance letter on Aesthetic bridge rail, barrier, and transition designs (PDF, 1156 KB). (1156 KB) View Text acceptance letter on Aesthetic bridge rail, barrier, and transition designs.
B-64D 4/9/2003 FHWA field offices aesthetic roadside barriers & bridge rails View PDF acceptance letter on aesthetic roadside barriers & bridge rails (PDF, 131 Kb). (131 Kb) View Text acceptance letter on aesthetic roadside barriers & bridge rails.
B-64C 4/21/2003 MwRSF - UN w-beam application for a 2:1 slope @ TL-3 View PDF acceptance letter on w-beam application for a 2:1 slope @ TL-3 (PDF, 55 Kb). (55 Kb) View Text acceptance letter on w-beam application for a 2:1 slope @ TL-3.
B-64B 3/10/2004 guardrail posts in rock or mowing strips View PDF acceptance letter on guardrail posts in rock or mowing strips (PDF, 110 KB). (110 KB) View Text acceptance letter on guardrail posts in rock or mowing strips.
B-64sup 9/12/2005 Additional generic cable barriers View PDF acceptance letter on Additional generic cable barriers (PDF, 304 KB). (304 KB) View Text acceptance letter on Additional generic cable barriers.
B-64A 11/1/2000 Pennsylvania DOT Modified Weak-Post W-beam guardrail @TL-3 View PDF acceptance letter on Modified Weak-Post W-beam guardrail @TL-3 (PDF, 210 kb). (210 kb) View Text acceptance letter on Modified Weak-Post W-beam guardrail @TL-3.
B-64 2/14/2000 FHWA Memo to Resource Centers, etc. Nonproprietary Guardrails and Median Barriers View PDF acceptance letter on Nonproprietary Guardrails and Median Barriers (PDF, 97 kb). (97 kb) View Text acceptance letter on Nonproprietary Guardrails and Median Barriers.
B-63 1/5/2000 Barrier Systems, Inc. Quickchange Moveable Barrier (QMB) View PDF acceptance letter on Quickchange Moveable Barrier (QMB) (PDF, 115 kb). (115 kb) No Text version is available
B-62 12/13/1999 Gunnar Prefab AB GPLINK pre-cast Temporary Concrete Barrier View PDF acceptance letter on GPLINK pre-cast Temporary Concrete Barrier (PDF, 62 kb). (62 kb) No Text version is available
B-61 11/22/1999 Rich Peter, California DOT K-rail (NJ Barrier) for Semi-permanent Installations View PDF acceptance letter on K-rail (NJ Barrier) for Semi-permanent Installations (PDF, 160 kb). (160 kb) No Text version is available
B-60 11/16/1999 Trinity Industries, Inc. O-rail Corrugated Metal-Beam Guardrail View PDF acceptance letter on O-rail Corrugated Metal-Beam Guardrail (PDF, 69 kb). (69 kb) No Text version is available
B-59 11/3/1999 R&P Products R&P Block for Strong-post W-beam Guardrail View PDF acceptance letter on R&P Block for Strong-post W-beam Guardrail (PDF, 23 kb). (23 kb) No Text version is available
B-58 10/8/1999 Midwest Roadside Safety Facility Clear-span Nested W-beam Guardrail View PDF acceptance letter on Clear-span Nested W-beam Guardrail (PDF, 151 kb). (151 kb) No Text version is available
B-57 10/8/1999 Aloha Plastic Recycling, Inc. Recycled Polyethylene Block View PDF acceptance letter on Recycled Polyethylene Block (PDF, 73 kb). (73 kb) No Text version is available
B-56B 9/5/2003 Structures of Ironwood Design alternative: rectangular timber rail View PDF acceptance letter on Design alternative: rectangular timber rail (PDF, 51 Kb). (51 Kb) View Text acceptance letter on Design alternative: rectangular timber rail.
B-56A 5/11/2000 Structures Of Ironwood, L.L.C. IRONWOOD Guidrail View PDF acceptance letter on IRONWOOD Guidrail (PDF, 113 kb). (113 kb) No Text version is available
B-56 6/18/1999 David Hubbell IRONWOOD Guardrail-aesthetic timber/steel rail View PDF acceptance letter on IRONWOOD Guardrail-aesthetic timber/steel rail (PDF, 3960 kb). (3960 kb) No Text version is available
B-55A 9/2/1999 Alaska Department of Transportation Thrie-Beam Transition to AK Bridge Railing View PDF acceptance letter on Thrie-Beam Transition to AK Bridge Railing (PDF, 1456 kb). (1456 kb) No Text version is available
B-55 5/18/1999 Steven Bradford, AK DOT & PF Multi-State bridge rail (2-tube on curb) Alaska View PDF acceptance letter on Multi-State bridge rail (2-tube on curb) Alaska (PDF, 438 kb). (438 kb) No Text version is available
B-54 5/18/1999 Roberto Fonseca-Martinez Virginia DOT (VDOT) temp.conc.barrier (F-shape) View PDF acceptance letter on Virginia DOT (VDOT) temp.conc.barrier (F-shape) (PDF, 192 kb). (192 kb) No Text version is available
B-53 5/18/1999 Rich Peter, Caltrans Type 80SW Bridge Rail Type 80 Bridge Rail View PDF acceptance letter on Type 80SW Bridge Rail
Type 80 Bridge Rail (PDF, 459 kb). (459 kb) No Text version is available
B-52A 12/8/2000 Easi-Set Industries 20 ft segments View PDF acceptance letter on 20 ft segments (PDF, 6 kb). (6 kb) View Text acceptance letter on 20 ft segments.
B-52 3/26/1999 Easi-Set Industries J-J Hooks temp. conc. barrier (NJ & F-shapes) View PDF acceptance letter on J-J Hooks temp. conc. barrier (NJ & F-shapes) (PDF, 438 KB). (438 KB) No Text version is available
B-51 3/26/1999 David Bailey-Consource Recycled plastic block for use w/ w-beam g.rail View PDF acceptance letter on Recycled plastic block for use w/ w-beam g.rail (PDF, 5 kb). (5 kb) No Text version is available
B-50 3/11/1999 NE Trans. Consortium NETC 2-Bar (curb mounted) & 4-Bar (sidewalk mounted) Bridge Rails View PDF acceptance letter on NETC 2-Bar (curb mounted) & 4-Bar (sidewalk mounted) Bridge Rails (PDF, 5 kb). (5 kb) No Text version is available
B-49C 9/18/2002 Bryson Products, Inc. RE-BLOCK:IV plastic blockout View PDF acceptance letter on RE-BLOCK:IV plastic blockout (PDF, 1 Mb). (1 Mb) View Text acceptance letter on RE-BLOCK:IV plastic blockout.
B-49B 2/8/2001 William D. Bryson, Bryson Products, LLC Recycled plastic block for use w/ w-beam g.rail @ TL-3 View PDF acceptance letter on Recycled plastic block for use w/ w-beam g.rail @ TL-3 (PDF, 5 kb). (5 kb) No Text version is available
B-49A 6/22/1998 Central Fabricators Inc. Expanded Material Specifications Accepted View PDF acceptance letter on Expanded Material Specifications Accepted (PDF, 2435 kb). (2435 kb) No Text version is available
B-49 5/7/1999 B.Atwood, Central Fab. Recycled plastic block for use w/ w-beam g.rail View PDF acceptance letter on Recycled plastic block for use w/ w-beam g.rail (PDF, 5 kb). (5 kb) View Text acceptance letter on Recycled plastic block for use w/ w-beam g.rail.
B-48 5/7/1998 J.M.Essex, EASI TRITON water-filled temporary barrier View PDF acceptance letter on TRITON water-filled temporary barrier (PDF, 6 kb). (6 kb) No Text version is available
B-47B 9/4/2001 Robert L. Wilson, P.E., Texas DOT Thrie-beam connection to vert. conc. parapet @TL-3 View PDF acceptance letter on Thrie-beam connection to vert. conc. parapet @TL-3 (PDF, 146 kb). (146 kb) View Text acceptance letter on Thrie-beam connection to vert. conc. parapet @TL-3.
B-47A 5/28/1999 Midwest Roadside Safety Facility Conditional Acceptance of Attachment to Vertical Wall View PDF acceptance letter on Conditional Acceptance of Attachment to Vertical Wall (PDF, 638 kb). (638 kb) No Text version is available
B-47 3/6/1998 Ron Faller, MWRSF Steel post & wood post Thrie-beam transitions to concrete parapets (two designs) View PDF acceptance letter on Steel post & wood post Thrie-beam transitions to concrete parapets (two designs) (PDF, 399 kb). (399 kb) No Text version is available
B-46 2/12/1998 Fracasso, Italy 3N Double Space Safety Barrier (1180-mm high) View PDF acceptance letter on 3N Double Space Safety Barrier (1180-mm high) (PDF, 427 kb). (427 kb) No Text version is available
B-45B 3/8/2002 California DOT Single-Slope Fabricated Steel Bridge Rail @ TL-4 View PDF acceptance letter on Single-Slope Fabricated Steel Bridge Rail @ TL-4 (PDF, 238 Kb). (238 Kb) View Text acceptance letter on Single-Slope Fabricated Steel Bridge Rail @ TL-4.
B-45A 3/6/1998 California DOT Single slope bridge rail No PDF version is available No Text version is available
B-45 2/4/1998 California DOT Single slope roadside/median barrier-9.1 degrees View PDF acceptance letter on Single slope roadside/median barrier-9.1 degrees (PDF, 287 kb). (287 kb) No Text version is available
B-44 1/27/1998 FHWA memo to field Report 350 acceptability of various wood and recycled blockouts for w-beam guardrail View PDF acceptance letter on Report 350 acceptability of various wood and recycled blockouts for w-beam guardrail (PDF, 134 kb). (134 kb) No Text version is available
B-43 10/17/1997 John Marinelli Lifetime Lumber Prod. Recycled gr offset block for wood and steel post w-beam View PDF acceptance letter on Lifetime Lumber Prod. Recycled gr offset block for wood and steel post w-beam (PDF, 349 kb). (349 kb) No Text version is available
B-42A* 2/20/2009 350 Rockingham precast Permits 18 and 20 ft long segments View PDF acceptance letter on Permits 18 and 20 ft long segments (PDF, 600 KB). (600 KB) View Text acceptance letter on Permits 18 and 20 ft long segments.
B-42 10/20/1997 M. Budd, Rockingham Precast Temporary cmb - F shape w/ slotted tube/T-bar Connection View PDF acceptance letter on Temporary cmb - F shape w/ slotted tube/T-bar Connection (PDF, 563 kb). (563 kb) No Text version is available
B-41 10/10/1997 D. Sicking, U of NebraskA Temporary cmb - F shape w/ pin & loop conn. View PDF acceptance letter on Temporary cmb - F shape w/ pin & loop conn. (PDF, 356 kb). (356 kb) No Text version is available
B-40 8/27/1997 J. Duckett, Barrier Systems Narrow QuickChange Moveable Barrier View PDF acceptance letter on Narrow QuickChange Moveable Barrier (PDF, 630 kb). (630 kb) No Text version is available
B-39B 6/24/2002 Mondo Polymer Technologies Modified polymer block View PDF acceptance letter on Modified polymer block (PDF, 50 Kb). (50 Kb) View Text acceptance letter on Modified polymer block.
B-39A 3/27/2002 Mondo Polymer Technologies Modified Polymer Offset Block View PDF acceptance letter on Modified Polymer Offset Block (PDF, 238 Kb). (238 Kb) View Text acceptance letter on Modified Polymer Offset Block.
B-39 3/11/1997 D.Tarrant - Mondo Polymer Polymer Offset Blocks for w-beam guardrail View PDF acceptance letter on Polymer Offset Blocks for w-beam guardrail (PDF, 400kb). (400kb) No Text version is available
B-38 8/29/1996 Connecticut DOT Merritt Parkway Guiderail (Aesthetic) TL-3 View PDF acceptance letter on Merritt Parkway Guiderail (Aesthetic) TL-3 (PDF, 745 kb). (745 kb) No Text version is available
B-37A 11/18/1999 K. Mak, TTI Box-Beam Transistions to WY TL-3 and TL-4 Bridge Railings View PDF acceptance letter on Box-Beam Transistions to WY TL-3 and TL-4 Bridge Railings (PDF, 1778 kb). (1778 kb) No Text version is available
B-37 7/1/1996 Wyoming DOT DOT 2 Bridge Railings (Steel Post & Rail w/ Curb) (TL-3 and TL-4) View PDF acceptance letter on DOT 2 Bridge Railings (Steel Post & Rail w/ Curb)
(TL-3 and TL-4) (PDF, 1014 kb). (1014 kb) No Text version is available
B-36 5/31/1996 Texas A&M (TTI) Low-Profile Concrete Barrier for Work Zones View PDF acceptance letter on Low-Profile Concrete Barrier for Work Zones (PDF, 458 kb). (458 kb) No Text version is available
B-35 3/27/1996 Creative Building Products Plastic Blockout for strong-post W-beam View PDF acceptance letter on Plastic Blockout for strong-post W-beam (PDF, 334 kb). (334 kb) No Text version is available
B-34G 8/9/2005 Office the Wall Products, LLC Product Name Change View PDF acceptance letter on Product Name Change (PDF, 110 KB). (110 KB) View Text acceptance letter on Product Name Change.
B-34F 12/11/2003 Traffic Safety Devices, Inc. Modification to ROADGUARD barrier View PDF acceptance letter on Modification to ROADGUARD barrier (PDF, 373 KB). (373 KB) View Text acceptance letter on Modification to ROADGUARD barrier.
B-34E 7/11/2002 Armorcast Products Company Modified Guardian Design @TL-3 View PDF acceptance letter on Modified Guardian Design @TL-3 (PDF, 586 Kb). (586 Kb) View Text acceptance letter on Modified Guardian Design @TL-3.
B-34D 12/20/2000 Sam Arnold, Guardian Safety Barrier Clarification of Guardian Status View PDF acceptance letter on Clarification of Guardian Status (PDF, 56 kb). (56 kb) View Text acceptance letter on Clarification of Guardian Status.
B-34C 8/5/1998 Safety Barrier Systems ROADGUARD - Name change from Guardian Safety Barrier View PDF acceptance letter on ROADGUARD - Name change from Guardian Safety Barrier (PDF, 401 kb). (401 kb) No Text version is available
B-34B 2/7/1997 Safety Barrier Systems Guardian Safety Barrier - Conditional Acceptance Upgraded to Full View PDF acceptance letter on Guardian Safety Barrier - Conditional Acceptance Upgraded to Full (PDF, 21 kb). (21 kb) No Text version is available
B-34A 11/14/1996 Safety Barrier Systems Guardian Safety Barrier View PDF acceptance letter on Guardian Safety Barrier (PDF, 77 kb). (77 kb) No Text version is available
B-34 1/29/1996 Safety Barrier Systems Guardian Temporary Barrier (Conditional TL-3) (Conditional acceptance upgraded to Full) View PDF acceptance letter on Temporary Barrier (Conditional TL-3) 
(Conditional acceptance upgraded to Full) (PDF, 327kb). (327kb) No Text version is available
B-33 12/22/1995 BGFM Assoc Concrete Safety Shape connection to bridge deck View PDF acceptance letter on Concrete Safety Shape connection to bridge deck (PDF, 196kb). (196kb) No Text version is available
B-32 12/8/1995 Arnold Forest Products Round Timber Guardrail Posts TL-3 View PDF acceptance letter on Round Timber Guardrail Posts TL-3 (PDF, 421kb). (421kb) No Text version is available
B-31 1/19/1995 R.Faller, U of Nebraska 5 Railings for timber Bridges View PDF acceptance letter on 5 Railings for timber Bridges (PDF, 451kb). (451kb) No Text version is available
B-30 1/17/1995 Safety Barrier Systems Guardian Water Filled Plastic Barrier View PDF acceptance letter on Water Filled Plastic Barrier (PDF, 578kb). (578kb) No Text version is available
B-29D 8/28/2002 RAMCO International Modification to Polylumber block View PDF acceptance letter on Modification to Polylumber block (PDF, 58 Kb). (58 Kb) View Text acceptance letter on Modification to Polylumber block.
B-29C 2/11/1999 New company name Polylumber Blockouts on Steel Post W-beam View PDF acceptance letter on Polylumber Blockouts on Steel Post W-beam (PDF, 43 kb). (43 kb) No Text version is available
B-29B 9/6/1995 RAMCO Polylumber Blockouts on Steel Post W-beam View PDF acceptance letter on Polylumber Blockouts on Steel Post W-beam (PDF, 312kb). (312kb) No Text version is available
B-29A 6/5/1995 ARW Polywood Manufacturer of Ramco’s blockouts View PDF acceptance letter on Manufacturer of Ramco’s blockouts (PDF, 120kb). (120kb) No Text version is available
B-29 1/9/1995 RAMCO Polylumber Blockouts on Wood Post W-beam View PDF acceptance letter on Polylumber Blockouts on Wood Post W-beam (PDF, 300kb). (300kb) No Text version is available
B-28 11/17/1994 Fracasso, Italy 3-N Steel Guardrail View PDF acceptance letter on 3-N Steel Guardrail (PDF, 416kb). (416kb) No Text version is available
B-27 8/1/1994 Collins & Aikman Corp. Recycled Blockout for wood-post guardrail View PDF acceptance letter on Recycled Blockout for wood-post guardrail (PDF, 343kb). (343kb) No Text version is available
B-26 1/7/1994 Energy Absorption Systems TRITON end treatments View PDF acceptance letter on TRITON end treatments (PDF, 94 KB). (94 KB) View Text acceptance letter on TRITON end treatments.
B-25 4/14/1993 Energy Absorption Systems Barrier Gate moveable median barrier closure View PDF acceptance letter on Barrier Gate moveable median barrier closure (PDF, 231kb). (231kb) No Text version is available
B-24 6/16/1993 Friend Town and Country Breakaway Mailbox Support for snow areas No PDF version is available No Text version is available
B-23 12/3/1992 MGS Innovations Precast Concrete Barrier (See Number CC-18 for Wyoming Box Beam End Treatment) No PDF version is available No Text version is available
B-22 12/17/1992 Ryerson Plastics Steel Reinforced Recycled Plastic Guardrail Posts No PDF version is available No Text version is available
B-21A 9/27/1994 (supplement to B-21) Additional information on application of Triton View PDF acceptance letter on Additional information on application of Triton (PDF, 78.3KB). (78.3KB) No Text version is available
B-21 11/27/1992 Energy Absorption Systems Triton Water Filled Barrier for Low Speed Applications View PDF acceptance letter on Triton Water Filled Barrier for Low Speed Applications (PDF, 79.7KB). (79.7KB) No Text version is available
B-20A 1/4/1993 Mobil Chemical Company Suppl. permits use as a blockout on steel posts. View PDF acceptance letter on permits use as a blockout on steel posts. (PDF, 168kb). (168kb) No Text version is available
B-20 9/1/1992 Mobil Chemical Company "Timbrex" Recycled Blockouts for use on Wood Strong-Post W-Beam Guardrail View PDF acceptance letter on Recycled Blockouts for use on Wood Strong-Post W-Beam Guardrail (PDF, 177kb). (177kb) No Text version is available
B-19 5/13/1992 Nat. Ready Mix Concrete Assn. Ontario "Tall Wall" Concrete Median Barrier No PDF version is available No Text version is available
B-18 5/5/1992 Pelco Products PB-5300 Ser. Cast Aluminum Traffic Signal Base. No PDF version is available No Text version is available
B-17 2/11/1992 (Minute Memo to Regions) Constant Slope Concrete Median Barrier. No PDF version is available No Text version is available
B-16 10/24/1991 Barrier Systems, Inc. Quickchange Moveable Median Barrier for use in permanent installations No PDF version is available No Text version is available
B-15 12/6/1990 Roadway Safety Services Dragnet Vehicle Arresting System View PDF acceptance letter on Dragnet Vehicle Arresting System (PDF, 174kb). (174kb) No Text version is available
B-14 11/8/1990 Smith-Midland Corp. J-hook connection for precast concrete median barriers. No PDF version is available No Text version is available
B-13 3/26/1987 TAPCO V-LOC Mailbox Support System No PDF version is available No Text version is available
B-12 4/16/1990 International Barrier Corp. Revised design of MK-7 Drainage/Obstacle Mod. No PDF version is available No Text version is available
B-11 12/4/1989 International Barrier Corp. MK-7HV Cement-Stabilized Sand Filled Barrier (normal profile IBC barrier) (Experimental) No PDF version is available No Text version is available
B-10 8/7/1989 International Barrier Corp. MK-9 Cement-Stabilized Sand Filled Barrier (low profile IBC barrier) No PDF version is available No Text version is available
B-09 6/16/1989 FHWA memo to Region 9 Yuma County Curved Guardrail (Bridge approach treatment) (Experimental) No PDF version is available No Text version is available
B-08 6/7/1989 International Barrier Corp. Special Assemblies and transitions for the IBC MK-7 sand filled barrier (Operational) No PDF version is available No Text version is available
B-07 4/19/1989 The Neel Company Concrete Barrier Drainage System (operational) No PDF version is available No Text version is available
B-06 3/29/1989 Delta Design and Development Tri-D Breakaway Delineator Post (Operational) No PDF version is available No Text version is available
B-05A 4/9/1996 Kelken Construction Systems Extended previous acceptance to F-shape View PDF acceptance letter on Extended previous acceptance to F-shape (PDF, 143kb). (143kb) No Text version is available
B-05 3/14/1989 L.B.Foster Co Precast Concrete Bridge Railing (NJ shape) Anchoring System (Operational) View PDF acceptance letter on Precast Concrete Bridge Railing (NJ shape) Anchoring System (Operational) (PDF, 391kb). (391kb) No Text version is available
B-04 2/16/1989 Michigan D.O.T Timber Guardrail Posts Specification (Oper.) No PDF version is available No Text version is available
B-03 7/15/1986 Barrier Systems, Inc Series 200 Construction Zone Barrier (Moveable Concrete Safety Shape) (Experimental) No PDF version is available No Text version is available
B-02 12/26/1985 International Barrier Corp. IBC Sand Filled Barrier (MK-7) (Operational) No PDF version is available No Text version is available
B-01A 5/20/1985 No PDF version is available No Text version is available
B-01 5/31/1985 (Memo to Regions) Modified Thrie Beam Guardrail (Operational) No PDF version is available No Text version is available

Program Contact

Mary McDonough
Roadway Departure Team Leader

202-366-2175

What's New

Sign Retroreflectivity Toolkit

Sign Upgrade Guide Specification

Publications

Low Cost Treatments for Horizontal Curve Safety

Pavement Edge Brochure: The Safety Edge