Program Guidance

This is the Federal Highway Administration's Guidance for the Safe Routes to School Program authorized under SAFETEA-LU. It remains in effect for SAFETEA-LU SRTS funds until these funds are expended.

The Bipartisan Infrastructure Law (BIL) codified SRTS at 23 U.S.C. 208 and expanded eligibility from kindergarten through 8th grade to kindergarten through 12th grade. The expanded eligibility also applies to SAFETEA-LU funds. The BIL did not provide any dedicated funds for the SRTS program. Therefore, references in section 208 related to apportionments cannot be required.

For updated guidance under the BIL, please see:

Previous memos

See also:

Table Of Contents

  1. I. Introduction
  2. II. State Program Structure and Administration
  3. III. Eligible Activities
  4. IV. Specific Funding Guidelines

INTRODUCTION

Background

The Federal-aid Safe Routes to School Program (hereinafter referred to as SRTS Program) was created by Section 1404 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Act (SAFETEA-LU), signed into Public Law (P.L. 109-59) on August 10, 2005. The SRTS Program is funded at $612 million and provides Federal-aid highway funds to State Departments of Transportation (DOTs) over five Federal fiscal years (FY2005-2009), in accordance with a formula specified in the legislation. These funds are available for infrastructure and noninfrastructure projects, and to administer State Safe Routes to School programs that benefit elementary and middle school children in grades K-8. The Federal-aid SRTS Program is administered by the Federal Highway Administration (FHWA) Office of Safety.

This document provides SRTS Program Guidance for State DOTs and other stakeholders involved in implementation and administration of SRTS programs. Guidance is provided to enable the states to move quickly and confidently in creating SRTS programs and spending program funds. This Program Guidance provides information to implement the legislation, and where it is presented, text from the legislation is in bold, italic font. While this Guidance addresses most aspects of the SRTS Program, it may not answer every question that has been, or is likely to be raised. Additional guidance will be provided throughout the first few years of the SRTS Program as questions are asked, clarifications are needed, experience is gained, and various approaches are tried and evaluated.

Top of Page

SRTS Program Purpose

Section 1404(b) of the legislation describes the purposes for which the SRTS Program was created:

(b) PURPOSES.--The purposes of the program shall be-

  1. (1) to enable and encourage children, including those with disabilities, to walk and bicycle to school;

  2. (2) to make bicycling and walking to school a safer and more appealing transportation alternative, thereby encouraging a healthy and active lifestyle from an early age; and

  3. (3) to facilitate the planning, development, and implementation of projects and activities that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools.

These stated purposes describe the overall intent of the SRTS Program. Different locations are likely to develop different initiatives and projects that address one or more of the purposes, but the overall SRTS Program within a State must meet all of these stated purposes. FHWA expects that States will develop many different approaches within the framework of the legislation and this guidance to serve these purposes.

SRTS Program Outcomes

Safe Routes to School is a cross cutting program. There are many possible outcomes as a result of successfully implementing projects and activities at the State and local level. These desired outcomes help clarify the broad purposes stated in the legislation and can assist implementation, including overall development and administration of State programs. They can be used to help evaluate potential projects, as well as understand the factors that affect the success of different activities, projects, and programs.

Desired outcomes of the Safe Routes to School Program include:

Comprehensive Nature of SRTS Activities – The “5 E’s”

FHWA recommends that SRTS efforts in the United States incorporate – directly or indirectly – five components, often referred to as the “5 E’s”. The 5 E’s are:

  1. Engineering – Creating operational and physical improvements to the infrastructure surrounding schools that reduce speeds and potential conflicts with motor vehicle traffic, and establish safer and fully accessible crossings, walkways, trails and bikeways.

  2. Education – Teaching children about the broad range of transportation choices, instructing them in important lifelong bicycling and walking safety skills, and launching driver safety campaigns in the vicinity of schools.

  3. Enforcement – Partnering with local law enforcement to ensure traffic laws are obeyed in the vicinity of schools (this includes enforcement of speeds, yielding to pedestrians in crossings , and proper walking and bicycling behaviors), and initiating community enforcement such as crossing guard programs.

  4. Encouragement – Using events and activities to promote walking and bicycling.

  5. Evaluation – Monitoring and documenting outcomes and trends through the collection of data, including the collection of data before and after the intervention(s).

Top of Page

Funding Levels

The SRTS Program is funded at $612 million and provides Federal-aid highway funds to State DOTs over five Federal fiscal years (FY2005-2009), in accordance with a formula specified in the legislation. FHWA will apportion SRTS funding annually to each State, in conjunction with regular Federal-aid highway apportionments.

SRTS Annual Funding Levels
Fiscal Year Funding
2005 $54 million
2006 $100 million
2007 $125 million
2008 $150 million
2009 $183 million

Funding Level by State

FHWA has developed a State-by-State breakdown of apportionments for FY 2005 – FY 2009. Future apportionments for FY 2007 – FY 2009 were projected using FY 2006 factors. FY 2007 – FY 2009 apportionments are provided for planning purposes only. The actual apportionments for FY 2007 through FY 2009 will be based on the latest available data; consequently, apportionments in those years may differ from the estimates presented here.

Program Funding Framework

The legislation established a number of parameters related to program funding which address the following items:

Reimbursement Program

The SRTS Program is a reimbursement program for cost incurred. It is not a “cash-up front” program. Costs incurred prior to FHWA project approval are not eligible for reimbursement.

Supplements Existing Programs

The SRTS legislation supplements, rather than replaces, current funding streams that support walking and bicycling transportation. States may find that they have more applicants than they can fund through the Federal-aid SRTS Program. Maintaining existing funding sources will help alleviate gaps between funding requests and available SRTS Program funds.

Existing state and local SRTS programs should therefore be sustained and coordinated with the Federal-aid SRTS Program. Existing programs and policies that will use SRTS Program funds should be brought into alignment with the overall purposes, desired outcomes and objectives of the SRTS Program, as well as the technical requirements of Section 1404.

Top of Page

II. STATE PROGRAM STRUCTURE AND ADMINISTRATION

DOT Program Administration Overview

The legislation includes a number of provisions that directly address how the SRTS Program is to be administered by the States:

Administered by State DOTs

Consistent with other federal aid highway programs, SRTS funding is to be administered by the State Department of Transportation.

Coordinator Requirement

The legislation requires a full-time position for State programs, and provides resources to fund these positions.

As stated in the Explanatory Statement accompanying SAFETEA-LU, the State SRTS Coordinator position in each State is to be funded from the infrastructure portion of a State’s SRTS Program apportionment. [FHWA memo of September 26, 2005 provides guidance relating to the Coordinator position.] In addition to the salary and fringe benefits of the Coordinator, other costs that are necessary and reasonable for the efficient performance of the Coordinator’s duties (e.g. travel, training, etc.) that are allowable under OMB Circular A-87 may be charged to SRTS funds. Indirect/administrative costs incurred by a State Transportation Department for other aspects of administering the SRTS Program also may be allowed if the State has an indirect cost rate established and approved in accordance with OMB Circular A-87. (OMB Circular A-87)

Specifies Eligible Recipients

The SRTS legislation identifies eligible funding recipients, which may include nontraditional partners of State DOTs. Many projects may be grassroots driven and project sponsors may be school or community based groups.

Top of Page

SRTS Program Development

FHWA recognizes that no single approach to program administration is superior or appropriate for all State DOTs; States vary greatly in size and potential numbers of schools to be served, and SRTS funding varies in a corresponding manner. The approach of combining funding for infrastructure projects and noninfrastructure activities into one program is somewhat unique in transportation and may not be easily accommodated by the existing administrative and program structures in many State DOTs.

FHWA encourages State DOTs to develop creative approaches to program structure and project implementation procedures, with the goal of best meeting the objectives described below. As the legislation requires the FHWA to report to Congress on the progress of this program, and also requires the FHWA to establish a Task Force to study effective strategies, FHWA anticipates that the SRTS Task Force will review State programs in the future to identify how the objectives are being met.

Objectives of SRTS Programs

The following four objectives should be considered in structuring programs at the State level:

Additional information is given for several of the objectives identified above within the text of this Guidance.

Statewide Multidisciplinary Coordination

FHWA encourages State DOTs to collaborate with other agencies and interested organizations within their State to create and implement a plan for how to best accomplish the purposes of the SRTS Program described in Section 1404. Integrating the State SRTS Program with multiple State agencies, such as bicycle and pedestrian programs, highway and traffic safety groups, environment and planning groups, law enforcement, public health officials, and boards of education, etc., will make the program outcomes more comprehensive and more effective in increasing safety and numbers of children walking and bicycling to school. Based on experiences of SRTS programs already operating in some States, FHWA also encourages State DOTs to involve experts and professionals representing SRTS stakeholders from the fields of public health, education, child safety, bicycling and walking and others as appropriate to assist with development and implementation of the program.

Top of Page

SRTS Program Administration

Minimum Infrastructure and Noninfrastructure Spending

FHWA anticipates that State DOTs need guidance on how to address both noninfrastructure and infrastructure activities in their program administration process. The legislation specifies that 10 to 30 percent of each State’s funding is to be spent on noninfrastructure activities:

The intent of this language is to ensure that education, encouragement, enforcement and evaluation activities are included as a significant part of SRTS activities. States and communities should combine these activities with engineering modifications to encourage an approach to SRTS that both results in safer walking and bicycling environments and encourages more walking and bicycling to school.

Program Administration Models

With the requirement that both infrastructure and noninfrastructure activities be funded by the SRTS Program, States will need to develop administrative procedures that can accomplish this task. FHWA encourages State DOTs to develop administrative procedures that effectively accommodate both infrastructure and noninfrastructure activities. The following are examples of program administration models: (this list is not intended to be comprehensive)

  1. One Agency/One Application: Program is administered by one single agency through one single application process. A State may decide that each application must consist of both infrastructure and noninfrastructure activities (or require evidence that both types of activities will be undertaken even if one is not part of the SRTS funding request) in order to ensure a comprehensive and integrated project at each location. States that use this approach should strongly consider development of a multi-disciplinary and multi-agency committee to evaluate project applications and recommend projects for funding. Additionally, States should consider using a separate rating system for the two different components within a single application and make grant selections based on the cumulative total. If a State decides that they will consider applications for infrastructure only and noninfrastructure only activities, the administration of SRTS should enable both types of projects to be evaluated fairly.

  2. One Agency/ Multiple Applications: Program is administered by one single agency through more than one type of grant application process. The State DOT could run distinct competitive grant application processes for both the infrastructure and noninfrastructure portions of funding. In this scenario, applicants should be required to show that their programs are comprehensive, i.e. infrastructure projects should be part of a larger effort that includes the five components of SRTS activities (“5 E’s”).

  3. Multiple Agencies (Split Program): Program funds are separated into infrastructure and noninfrastructure categories and administered by different divisions of DOT, different State agencies, or a nonprofit organization. The State DOT could provide funding to another state-level department or a nonprofit organization (e.g. health department, office of traffic safety, a bicycle and pedestrian safety department within the DOT, a University, or a non-governmental organization) to administer the grant applications and evaluation components for the noninfrastructure requirements. This entity would then report to the State DOT who remains responsible for the administration and stewardship of the SRTS Program, regardless of whether a different entity is administering parts of the Program.

  4. Phased Program: Program funds are given in “stages:” 1) initial grants are given to provide technical assistance, assessment and project/activity planning support, 2) follow up funds for execution of infrastructure and noninfrastructure projects. The State DOT could provide a portion of the noninfrastructure funding to a service provider (i.e. through a competitive bid process) with demonstrated success in conducting community-based SRTS training, assessment and technical assistance. This third party would be responsible for training schools regarding the development of SRTS plans, and in providing technical assistance where needed. Schools would then be eligible for a “second stage” of funding once their SRTS plans are completed. This option may be desirable in States where there is a need to target low income and/or rural areas.

    Regardless of how each State structures its SRTS Program and project application process, FHWA strongly recommends that infrastructure and noninfrastructure activities be coordinated in order to achieve successful outcomes.

Top of Page

Recommended Evaluation of SRTS Programs

Ongoing review and evaluation activities associated with SRTS programs are vital for the continual improvement of each program (and for the study and development of a strategy for advancing SRTS programs nationwide, as called for in Section 1404). FHWA is required to report to Congress on the progress of the SRTS Program, and therefore requests that States gather and provide the following information with respect to the expenditure of these funds:

Evaluation of Safety Benefits

Understanding safety outcomes provides information about how SRTS activities reduce fatalities and injuries, as well as reduce risk associated with walking and bicycling to school. FHWA acknowledges some challenges in evaluating crash data with respect to the success of SRTS programs. Crash reporting systems generally do not distinguish if pedestrian and bicycle crashes occur during the trip to/from school. Also, to measure program effectiveness in terms of crashes, it is appropriate to review accident data 3 years prior and 3 years following the implementation of a comprehensive SRTS program. Funding cycles are likely to be considerably shorter than this timeframe.

For this reason, FHWA will accept other methods of evaluating the safety benefits of the program, such as changes in public perception of safety, the effect on safety behaviors among participants of SRTS programs, or increased awareness of safe walking and bicycling practices.

Evaluation of Behavioral Changes

Understanding the effect of the program on the number of students who walk and bicycle, versus arrive/depart from school via other modes of transportation provides information about how SRTS activities affect the behavior of students and motorists. States are asked to measure this change by collecting information prior to the start of SRTS programs, and then after such programs have been established in participating schools. Care should be taken to compare outcomes based on similar conditions (i.e. weather, regular day or contest day, etc.). FHWA recognizes that where programs are being implemented specifically to reduce hazards for children already walking and bicycling to school, this would not necessarily be an appropriate evaluation measure.

Evaluation of Other Potential Benefits

In addition to the two categories listed above, States may choose to evaluate their programs in terms of:

  1. The number of new partnerships created as a result of the program,
  2. The number of students and/or schools reached through the program,
  3. Measurements of student health, air quality, congestion, and other metrics noted or implied by the legislative purposes of the program, and
  4. Improvements to the built environment that benefit the ability to walk and bicycle to and from schools (i.e., the number of new facilities, miles of sidewalks, etc.).

Additional guidance will be provided in the future with regards to the evaluation of program success. Recommended data collection forms that would allow for standardized data collection across States also will be provided. Preliminary forms for collecting before-project data will be provided soon so States can consider including the forms in their call for applications. It is anticipated that a more comprehensive package of standardized evaluation tools, including post-project forms, will be provided in time for program and project evaluations.

Top of Page

Project Selection

Each State DOT develops its own procedures and policies for soliciting and selecting projects for funding, including but not limited to, selection criteria, funding cycles, grant amounts, time limits, etc. This Program Guidance provides the broad outlines and requirements a State should follow when implementing its Program. As stated in the Conference Report for SAFETEA-LU, States should be encouraged to create competitive application forms, criteria, and evaluations that are appropriate for the two different types of projects.” (SAFETEA-LU, Joint Explanatory Statement of the Committee of the Conference, Report 109-203, pp. 866-867)

Regardless of how each State structures its SRTS program and project application process, FHWA strongly recommends that infrastructure and noninfrastructure activities be coordinated in order to achieve successful outcomes.

Projects Competing from Different Jurisdictional Levels

SRTS activities occur at three jurisdictional levels – at the school level, on school system or region-wide basis, or in some States, on a statewide level. The right structure for balancing spending at these different levels will vary from State to State. FHWA recommends that State SRTS Programs develop an application process that ensures project applicants will compete only with other project applicants proposing activities at the same level. These levels can be described as follows:

Funding Set-Asides

States may want to evaluate what needs or priorities they have for encouraging activity at any or each of these levels, and consider setting aside portions of the SRTS funding for projects at one or more of each level. Statewide projects might include those that the State DOT itself has an interest in undertaking.

Project Selection Criteria

Project selection criteria should require applications to address both infrastructure and noninfrastructure activities, regardless of whether the grant is requesting one type of funding, or both. Applicants should be permitted to show evidence that they are either planning these activities (either through funds requested through the Section 1404 Program or other sources) or already have adequate programs to address the other “E’s” that are not included in the current application.

FHWA recommends that States establish and consider multiple eligibility criteria including, but not limited to:

The above approach also allows SRTS activities to leverage other potential funding resources as mechanisms to fund these activities. However, Section 1404 clearly states that the Federal share of the cost of the project shall be 100 percent (Sec. 1404(i)), therefore States are not permitted to require a funding match. In order to leverage other funds, though, States may consider giving further consideration to applicants that have secured additional funding or resources. However, to protect the ability of disadvantaged communities to compete effectively, equal weight must be given to applications from schools or communities with fewer resources at their disposal.

Sample application materials are provided in the Appendix.

Public Involvement in Project Selection

FHWA recommends that States include some level of public involvement as part of the project selection process, due to the unique nature of SRTS programs and the need for multiple perspectives in decision-making. For example, when advancing projects under the FHWA Transportation Enhancements and Recreational Trails Programs, many States engage public stakeholder committees in the project selection process. The committees may include representatives of user groups and other affected parties. Such committees could also work with the State’s SRTS Coordinator to guide the overall direction of the State’s SRTS program activities, and help to ensure that it consistently serves the Program purposes set forward in SAFETEA-LU.

Top of Page

III. ELIGIBLE ACTIVITIES

Funding Categories

Funds are available for infrastructure-related projects and noninfrastructure-related activities:

  1. (1) INFRASTRUCTURE-RELATED PROJECTS.-- (A) IN GENERAL.--Amounts apportioned to a State under this section may be used for the planning, design, and construction of infrastructure-related projects that will substantially improve the ability of students to walk and bicycle to school,…

  2. (2) NONINFRASTRUCTURE-RELATED ACTIVITIES.-- (A) IN GENERAL.--In addition to projects described in paragraph (1), amounts apportioned to a State under this section may be used for noninfrastructure-related activities to encourage walking and bicycling to school,… (Sec. 1404(f))

Projects and activities in each category should directly support increased safety and convenience for elementary and middle school children in grades K-8 to bicycle and/or walk to school. Projects may indirectly benefit high school age youth or the general public, however these constituencies cannot be the sole or primary beneficiaries.

Infrastructure projects constructed with these funds must be accessible to persons with disabilities, per the Americans with Disabilities Act Accessibility Guidelines (ADAAG) at 28 CFR Part 36, Appendix A, as enforced by the U.S. Department of Justice and FHWA, and as required under Section 504 of the Rehabilitation Act.

Top of Page

Eligible Infrastructure Projects

SAFETEA-LU specifies that eligible infrastructure-related projects include the planning, design, and construction of infrastructure-related projects that will substantially improve the ability of students to walk and bicycle to school, including

Given the general guidelines established in the legislation, each State DOT will be responsible for determining the specific types of infrastructure projects that are eligible for this program. Below is a list of potential infrastructure projects that some States have used for existing SRTS or related programs. This list is not intended to be comprehensive; other types of projects that are not on this list may also be eligible if they meet the objectives of reducing speeds and improving pedestrian and bicycle safety and access.

Planning, design, and engineering expenses, including consultant services, associated with developing eligible infrastructure projects are also eligible to receive infrastructure funds.

Project Location

For infrastructure projects, public funds must be spent on projects within the public right of way. This may include projects on private land that have public access easements. Public property includes lands that are owned by a public entity, including those lands owned by public school districts. Construction and capital improvement projects also must be located within approximately two miles of a primary or middle school (grades K – 8). Schools with grades that extend higher than grade 8, but which include grades that fall within the eligible range, are eligible to receive infrastructure improvements.

For projects on private land, there must be a written legal easement or other written legally binding agreement that ensures public access to the project. There must be an easement filed of record, which specifies the minimum length of time for the agreement to maximize the public investment in the project. The project agreement should clearly state in writing:

The project must remain open for general public access for the use for which the funds were intended for the timeframe specified in the easement or lease. The public access should be comparable to the nature and magnitude of the investment of public funds.

Reversionary clauses may be appropriate in some instances. These clauses would assure that if the property is no longer needed for the purpose for which it was acquired, it would revert to the original owner.

Real Property Acquisition

For real property acquisition, all project sponsors must comply with the provisions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970. Regulations implementing this Act are found in 49 CFR Part 24. These regulations will be applied to evaluating the acquisition of real property and any potential displacement activities. See www.fhwa.dot.gov/real_estate/uniform_act/index.cfm.

Top of Page

Eligible Noninfrastructure Activities

SAFETEA-LU specifies that eligible noninfrastructure activities are activities to encourage walking and bicycling to school, including

The above categories are broad in nature. There are several sources of information available nationally that provide further guidance on noninfrastructure activities, such as the National Highway Traffic Safety Administration’s (NHTSA) Safe Routes to Schools: Practice and Promise, and NHTSA’s Safe Routes to School Toolkit.

Existing SRTS programs have used noninfrastructure funds for the following purposes:

This listing is not inclusive, although States considering funding items not listed must ensure that the activity meets the purposes of the SRTS Program as specified by SAFETEA-LU, and that the item is generally comparable to those listed above or in the legislation.

Activity Locations

Traffic education and enforcement activities must take place within approximately two miles of a primary or middle school (grades K – 8). Other eligible activities under the noninfrastructure portion of the SRTS Program do not have a location restriction. Education and encouragement activities are allowed at private schools as long as other noninfrastructure program criteria are fulfilled.

Top of Page

Inappropriate Uses of SRTS Funds

States are not permitted to use Section 1404 funds for projects that do not specifically serve the stated purposes of the SRTS Program, nor should they be used for reoccurring costs except as specifically provided in the legislation. For example, in general, Program funds should not be used to pay crossing guard salaries, as these are reoccurring costs (although funds may be used for crossing guard training programs). Funding requests for costs that are expected to be reoccurring costs in future years should include plans for how the costs will be funded in the future and a rationale for how federal funding of 1-2 years will enable leveraging of future financial security for the activity.

The use of Section 1404 funds for projects that reorganize pick-up and drop-off primarily for the convenience of drivers rather than to improve child safety and/or walking and bicycling access is not permitted, nor should Program funds be spent on education programs that are primarily focused on bus safety. Improvements to bus stops are not eligible for this funding.

Top of Page

IV. SPECIFIC FUNDING GUIDELINES

Requiring Matching Funds Not Permitted

States may not require applicants to provide a funding “match” for the federal share of a project or activity under this program. The legislation states that the cost of a project or activity under this program “shall be 100 percent.” FHWA interprets the Congressional intent of this requirement as a desire to protect low-income communities from being at a disadvantage when competing for funds by not requiring a match.

Top of Page

Leveraging Additional Funds

Experience from States with existing SRTS programs is that applications for SRTS funds greatly exceed available funding resources. When this occurs, worthy projects may not be able to receive funding due to the limited resources. Creatively leveraging funds to maximize the efficient use of SRTS funds may improve the ability of States to provide funds to eligible projects and activities. This process may not unfairly disadvantage low-income communities when competing for funds. Section 1404 funds include a requirement that the Federal share of the cost of a project or activity be 100 percent.

Top of Page

Utilizing Related Funding Sources

There are many additional federal, state and local funding sources available to complement the Federal Safe Routes to School resources. Funding resources that could be used to supplement the Federal Safe Routes to School activities include but are not limited to health, recreation, transportation, physical education, law enforcement, and safety funds. Flexible transportation resources including the Transportation Enhancements Program, the Surface Transportation Program, the Congestion Mitigation and Air Quality Program, Equity Bonus Funds, the new state Highway Safety Improvement Program, and National Highway Traffic Safety Administration 402 Traffic Safety funds are available and eligible to be used for certain Safe Routes to School projects. States, either as part of their program or through SRTS project applicants, may use Section 1404 funds to attract, combine and apply many resources for the furtherance of the SRTS program purposes and objectives. Finally, many States and local communities have already established funding programs for SRTS that should remain available for projects and applications.

Top of Page

Multi-year Funding and Funding Cycles

Some States have found implementation of SRTS programs or activities over several years, rather than in one single school year, to be beneficial by allowing adequate time to fully establish these programs and “institutionalize” them to become a standard part of the school year. This can also be beneficial to infrastructure projects that extend over a substantial time period, and FHWA recommends that States consider accommodating multi-year activities among their eligible projects.

Considering the administrative burden of evaluating funding proposals on a yearly basis, this strategy may also lend itself to multi-year “Calls for Applications,” i.e. a funding cycle that occurs every two years instead of once per year.

Top of Page

Project streamlining

A number of streamlining measures are available to deliver SRTS projects:

Categorical Exclusions

Except in unusual circumstances, FHWA expects that SRTS infrastructure projects will fall under the categorical exclusions provisions of 23 CFR Sec 771.117 that recognize construction of bicycle and pedestrian lanes, paths, and facilities as not involving significant environmental impacts. This will greatly streamline compliance with the National Environmental Policy Act (NEPA) requirements.

TIP / STIP Grouping

Transportation projects proposed for funding under 23 U.S.C., including recipients of Safe Routes to Schools funds, must be programmed in a metropolitan planning organization’s Transportation Improvement Program (TIP) and the Statewide

Transportation Improvement Program (STIP). Except in unusual circumstances, SRTS projects will not be considered regionally significant as defined by 23 CFR 450.104 and may be grouped each program year by function, geographic area and/or work type in a metropolitan planning organization’s TIP and the STIP, rather than listed individually. See 23 USC 134 (j) (3) for TIP. See 23 USC 135 (g) (4) (C) for STIP.

Working Capital Advance

A working capital advance may be available, on a limited basis, to local governments and non-profit organizations through the working capital advance option 49 CFR Part 18 and 19. Funds provided for this program are on a cost reimbursement basis. However, Section 49 CFR, Part 18 (for local governments) and 49 CFR, Part 19 (for nonprofit organizations) provides for a working capital advance payment option when necessary to make prompt payments for project costs. Since payments to States are governed by the Cash Management Improvement Act, this advance payment option is only available to local governments and non-profit organizations through the State DOT. The following procedures apply:

Costs incurred prior to FHWA project approval are not eligible for reimbursement.

Top of Page

Title 23 requirements

(Updated 3/3/06)

Congress included the following statutory provisions in the Safe Routes to School Program legislation:

(i) Applicability of Title 23 – Funds made available to carry out this section shall be available for obligation in the same manner as if such funds were apportioned under chapter 1 of title 23, United States Code; except that such funds shall not be transferable and shall remain available until expended, and the Federal share of the cost of a project or activity shall be 100 percent.

(j) TREATMENT OF PROJECTS—Notwithstanding any other provision of law, projects assisted under this subsection shall be treated as projects on a Federal-aid system under chapter 1 of title 23, United States Code.

The above language means that SRTS infrastructure projects and noninfrastructure activities need to comply with applicable provisions in title 23, such as project agreements, authorization to proceed prior to incurring costs, etc.  In addition, infrastructure projects under the Safe Routes to School program must comply with Davis Bacon prevailing wage rates, competitive bidding, and other contracting requirements, etc, even for projects not located within the right-of-way of a federal-aid highway.

Since eligible subgrantees include non-traditional partners at the community level who may not be familiar with Title 23 requirements, it’s important that the State fully inform potential subgrantees of these Federal requirements ahead of time.  Some subgrantees may wish to seek a lead sponsor such as a county public works department that has experience with Federal construction contracts in general, and Title 23 in particular.

Top of Page

Grant Management

(Updated 3/3/06)

Grants (i.e. funding for infrastructure projects and non-infrastructure activities) are to be administered in accordance with the provisions in 49 CFR Part 18, the U.S. DOT's regulations that implements the government-wide Common Rule for grants and cooperative agreements to State and local governments and applicable FHWA regulations in 23 CFR.

States are to follow State law and procedures when awarding and administering sub grants to local and Indian tribal governments in accordance with 49 CFR 18.37.

Sub awards by a State to institutions of higher education, hospitals and nonprofit organizations are to be administered in accordance with 49 CFR Part 19, the USDOT regulation that implements the government-wide common rule for grants and cooperative agreements to institutions of higher education, hospitals, and non profit organizations.

Allowable Costs

(Posted 3/3/06)

The U.S. Office of Management and Budget (OMB) circulars on allowable costs that may be charged to Federal funds are applicable to SRTS grants and are incorporated by reference in regulation, 49 CFR 18.22. Section 18.22(b) lists the appropriate cost principles for various kinds of organizations:

For the costs of a Use the principles in
State, local, or Indian tribal government. OMB Circular A-87.
Private, nonprofit organization other than an (1) institution of higher education, (2) hospital, or (3) organization named in OMB Circular A-122 as not subject to that circular. OMB Circular A-122.
Educational institutions. OMB Circular A-21.
For-profit organization other than a hospital and an organization named in OMB Circular A-122 as not subject to that circular. 48 CFR Part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with cost principles acceptable to the Federal agency.

Audit requirements for grants and subgrants are found in 49 CFR 18.26 and 49 CFR 19.26, which refer to OMB Circular A-133: Audits of States, Local Governments, and Non-Profit Organizations.

In general, costs are allowable, as specified in the appropriate OMB Circular listed in the table above, if the costs are necessary, reasonable, and benefit this program. Unallowable costs are those for purposes not related to this program.

OMB Circular A-87 lists Cost Principles for State, Local, and Indian Tribal Governments:

If the entity expending the Federal funds is not a State, local, or Indian tribal government, use the appropriate OMB Circular applicable to that entity. For example, OMB Circular A-122, Attachment A, Section C, covers indirect costs for nonprofit organizations.

Top of Page

Program Codes - Fiscal Management Information System (FMIS) (Updated on 1/24/06)

Program codes have been assigned for the Safe Routes to School Program in FHWA's Fiscal Management Information System (FMIS). Due to the lateness of SAFETEA-LU, FHWA had to establish two sets of Programs Codes: HU series for FY 2005 and a LU series for FY 2006 - 2009.

Due to the minimum / maximum provision in law for the Noninfrastructure category, ("not less than 10 percent and not more than 30 percent of each State's apportionment for a fiscal year shall be used for noninfrastructure") a 20% overlap between infrastructure and noninfrastructure funding exists.

To accommodate this 20% overlap and to ensure accurate reporting, an "Either" code has been established as a "funding source, parent code" with two subsidiary, limiting codes that roll up to the parent code. Obligations under the subsidiary codes should automatically draw down from the parent codes.

FY 2005 FY 2006 – FY 2009 Description
HU10 LU10 10% Noninfrastructure activities
HU20 LU20 70% Infrastructure projects
HU30 LU30 20% Either: Noninfrastructure or Infrastructure (parent code)
HU40 LU40 Subsidary code for 20% Either: Noninfrastructure
HU50 LU50 Sudsidary code for 20% Either: Infrastructure

It is important for program monitoring that States accurately report their expenditures using the above codes. For the "Either code" States should report how they spent their flexible 20% funding between the two categories using the subsidiary codes discussed above.

SRTS funds are available until expended (they are not subject to the usual Federal-aid highway four-year rule of availability).

Top of Page

Obligation Limitation

The SRTS Program is subject to the Federal-aid highway program's obligation limitation. By law, obligation limitation for formula programs, including the SRTS Program, is distributed in a lump sum to each State DOT. Within the overall limitation, each State has flexibility to choose how to use funds among the various highway programs as long as the total obligations do not exceed the set limit.

Brief background about Obligation Limitation -- Each year appropriations legislation sets a limitation on the obligation of Federal-aid highway program funds. This limitation does not reduce the amount of funding distributed, but rather limits the amount of the distributed funds that may be obligated in that year. Such limitations serve to align the funds authorized in multi-year legislation like SAFETEA-LU with more current economic and fiscal conditions as part of the required annual Federal budget process.