|
Home > SAFETEA-LU > Guidance on 23 U.S.C. ยง 130 Annual Reporting Requirements for Railway-Highway Crossings
Attachment 2
Railway-Highway Crossings Project Metrics 23 USC 130 STATE
| Project Number |
Location (County/Municipality, Highway) |
USDOT Crossing Number |
FHWA Roadway Functional Classification (see Note 1) |
Project Type and Description (using the suggested groupings provided in guidance) |
Crossing Protection (active, passive) |
Crossing type (vehicle, pedestrian, etc) |
Total Project Cost |
Funding Type |
Before Crash Data (________ years) |
After Crash Data (_______years) |
Effectiveness (see Note 2) |
| Fatal. |
Serious Injury |
Other Injury |
PDO |
Fatal. |
Serious Injury |
Other Injury |
PDO |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notes:
- See FHWA Functional Classification Guidelines at http://www.fhwa.dot.gov/planning/fcsec2_1.htm
- Show whether the project achieved its purpose using benefit-cost or other methodology developed by the State. These analyses may include all crashes, or targeted crash types, depending on the nature of the improvement that was implemented.
Back to Image
|