Safety Eligibility Letter B-146

Download Version
PDF [5.27 MB]

DOT logo
U.S. Department of Transportation
Federal Highway Administration

1200 New Jersey Ave. S.E.
Washington, D.C. 20590

July 17, 2008

In Reply Refer To: HSSD/B-146

Mr. Gerald M. McCarthy, Coordinator
New England Transportation Consortium
c/o Advanced Technology & Manufacturing Center
University of Massachusetts Dartmouth
151 Martine Street
Fall River, MA 02723

Dear Mr. McCarthy:

This letter is in response to your request for the Federal Highway Administration (FHWA) acceptance of the New England Transportation Consortium (NETC) roadside safety system for use on the National Highway System (NHS).

Name of systems:

  1. 1) NETC New Hampshire T2 Bridge Rail Transition
  2. 2) NETC New Hampshire T4 Bridge Rail Transition
  3. 3) NETC Massachusetts End Wall Transition to S3-TL4 Bridge Rail with Sidewalk
  4. 4) NETC Massachusetts End Wall Transition to S3-TL4 Bridge Rail Curb-Mounted

Type of systems:

  1. 1&2) W- to Thrie-Beam Transition direct to beam-and-post bridgerail
  2. 3&4) W- to Thrie-Beam Transition to concrete end wall

Test Level:

  1. 1&2) National Cooperative Highway Research Program (NCHRP) Report 350 Test Level 3 (TL-3)
  2. 3&4) NCHRP Report 350 TL-4

Testing conducted by: Texas Transportation Institute (TTI)
Date of request: February 1, 2006
Date of completed package: August 29, 2007 (NETC), June 26, 2008 (TTI)

You requested that we find these systems acceptable for use on the NHS under the provisions of the NCHRP Report 350 “Recommended Procedures for the Safety Performance Evaluation of Highway Features.” We appreciate your patience and cooperation while finalizing this acceptance package.

Requirements
Roadside safety systems should meet the guidelines contained in the NCHRP Report 350, "Recommended Procedures for the Safety Performance Evaluation of Highway Features". FHWA Memorandum “ACTION: Identifying Acceptable Highway Safety Features” of July 25, 1997 provides further guidance on crash testing requirements of longitudinal barriers.

Description
In the current project, the NETC developed bridge rail transitions for two bridge rail systems and for a concrete end wall, and desired to crash test them to TL-3 requirements of the NCHRP Report 350. Four transitions were developed:

  1. Transition to the 2-Bar steel bridge rail with approach curb.
  2. Transition to the 4-Bar steel bridge rail mounted on a sidewalk.
  3. Transition to the concrete end wall with approach curb.
  4. Transition to the concrete end wall mounted behind a sidewalk.

Transitions #1 and #2 were developed by New Hampshire Department of Transportation (NHDOT) and transitions #3 and #4 by Massachusetts Highway Department (MHD). The MHD transitions were designed for use with various bridge rail systems beyond the end wall.

Our office reviewed the four transitions and determined that two crash tests were required.

  1. Test 3-21 on transition #1 to the 2-bar steel bridge rail with approach curb for TL-3.
  2. Test 3-21 on transition #4 to the concrete end wall behind a sidewalk for TL-4.

The FHWA accepted transition #3 to the concrete end wall with approach curb for TL-3 based on crash tests of similar systems already performed by others, and will accept transition #2 to the 4-bar steel bridge rail mounted on a sidewalk pending successful testing of transition #1 to the 2-bar steel bridge rail system with approach curb.

The NETC decided that if the first test (using the 2000P vehicle) on transition #4 to a concrete end wall mounted behind a sidewalk was successful a TL-4 test with a single-unit truck (8000 kg vehicle) would be performed. If transition #4 was successful for TL-4, the FHWA indicated that they would accept transition #3 with an approach curb for TL-4 without testing.

Brief descriptions of the transitions follow:

New Hampshire Transitions
The NETC New Hampshire transition consisted of standard W-beam guardrail attached to a symmetric 10-gage W-beam to Thrie-beam transition section, attached to nested 12-gage Thrie beam, connected to the two tube transition rail by means of a Thrie-beam terminal connector. The two tube transition rails are the same tubular elements used in the bridge rail. A TS 8 x 4 x 5/16 rail element was attached to the top of the W6 x 25 steel posts at a height of 34 inches above the pavement surface (to the top of the rail) with two 6-inch long, 3/4-inch diameter round headed bolts. The TS 4 x 4 x 1/4 bottom rail was attached to the posts at a height of 20 inches with similar bolts. Wood posts throughout the transition were 6 inches x 8 inches x 7 feet long. The seven wood posts adjacent to the tubular transition rail were installed 18-3/4 inches on center, and the remainder of the posts in the transition were installed 37-1/2 inches on center. Posts in the w-beam section were installed at 6 foot 3-inch centers. The upstream end of the guardrail was anchored with an ET terminal. A 7-inch tall simulated granite curb was installed throughout the transition and extended in front of the rail tubes by 6 inches, and in front of the Thrie-beam by 1-1/4 inches.

Massachusetts Transitions
The Massachusetts S3-TL4 Steel Bridge Railing system is a beam and post system consisting of three tubular steel rail elements mounted on steel wide flange posts bolted to the concrete deck/sidewalk. It was mounted on a sidewalk a distance of 61 inches from the face of an 8-inch high curb. The bridge railing was attached to a concrete end wall that is part of the bridge abutment. The end wall flares away from the face by 8.8 inches over a distance of 2-feet, 10 inches. A collapsing tube assembly is located in this flared area. The Thrie-beam transition was attached to the straight portion of the concrete end wall with a Thrie-beam end shoe. Two sections of 12 gage Thrie-beam were nested and attached to the end shoe and wood support posts. Posts 1 through 4 were 6 x 8-inch x 7-foot long with 18-inch long blockouts of the same section, spaced 1-1/2 feet on center. Posts 5 and 6 were 6x8-inch x 6.5-foot long, with 18-inch blockouts (6 x 8) and spaced 3 feet on center. Post 7 was 6x8-inch, 6.5-foot long with a 14-inch blockout (6 x 8). A 10-gage symmetric Thrie-beam to W-beam transition was mounted on posts 5, 6, and 7. The sidewalk transitioned from 8 inches tall to 6 inches tall at post 8.

Testing
Full-scale truck testing was conducted on these transitions, as summarized in the tables below and detailed in the enclosed Crash Test Data Sheets for reference. The New Hampshire transition was tested to TL-3, whereas the Massachusetts transition was tested to TL-4.

Test Number Test 3-21
401181-1
Test 4-21
401181-2
Test 4-22
401181-3
Transition New Hampshire Massachusetts Massachusetts
Critical Impact Point Location 1635 mm from
1st bridgerail post
1570 mm from
start of wall slope
1570 mm from
start of wall slope
Mass of Test Vehicle 2135 kg
(2000P)
2108 kg
(2000P)
8106 kg
(8000S)
Impact Speed 102.3 km/hr 101.2 82.2
Impact Angle 24.9 degrees 25.2 degrees 13.6 degrees
Occupant Impact Velocity 5.2 mps long.
7.5 mps lat.
5.1 mps long.
6.6 mps lat.
2.5 mps long.
3.0 mps lat.
Maximum Ridedown* -8.3 g’s long.
13.5 g’s lat.
-19.3g’s long.
17.4g’s lat.
-4.5 g’s long.
7.4 g’s lat.
Working Width 580 mm 450 mm 539 mm
Max. Occup. Deform.** 44 mm 104 mm N/A

*Maximum Ridedown: maximum longitudinal and lateral ridedown accelerations
**Max. Occup. Deform.: maximum occupant compartment deformation

Findings
In all three impacts, the test vehicles were smoothly redirected by the barrier, with maximum roll angles quite low or negligible. The results of the testing met the FHWA requirements and, therefore, the transitions described above and detailed in the enclosed drawings are acceptable for use on the NHS under the range of conditions tested, when proposed by a highway agency.

Findings
The systems described in the various requests above and detailed in the enclosed drawings are acceptable for use on the NHS under the range of conditions tested, when such use is acceptable to a highway agency. Specifically, the following scenarios are acceptable:

  1. New Hampshire Transition to the 2-Bar steel bridge rail with approach curb.
  2. New Hampshire Transition to the 4-Bar steel bridge rail mounted on a sidewalk.
  3. Massachusetts Transition to the concrete end wall with approach curb.
  4. Massachusetts Transition to the concrete end wall mounted behind a sidewalk.

Please note that system #4 requires that either there be an existing sidewalk on the approach to the bridge, or that a gradual transition from the shoulder grade to the sidewalk is provided in conjunction with the transition.

Please also note the following standard provisions that apply to the FHWA letters of acceptance:

 

Sincerely yours,

David A. Nicol

David A. Nicol, P.E.
Director, Office of Safety Design
Office of Safety

Page last modified on August 16, 2011
Safe Roads for a Safer Future - Investment in roadway safety saves lives
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000