Railway-Highway Crossings Project Metrics 23 USC 130 STATE

Project Number Location (County/Municipality, Highway) USDOT Crossing Number FHWA Roadway Functional Classification (see Note 1) Project Type and Description (using the suggested groupings provided in guidance) Crossing Protection (active, passive) Crossing type (vehicle, pedestrian, etc) Total Project Cost Funding Type Before Crash Data (________ years) After Crash Data (_______years) Effectiveness (see Note 2)
Fatal. Serious Injury Other Injury PDO Fatal. Serious Injury Other Injury PDO
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   

Notes:

  1. See FHWA Functional Classification Guidelines at https://www.fhwa.dot.gov/planning/processes/statewide/related/functional_classification/fc02.cfm
  2. Show whether the project achieved its purpose using benefit-cost or other methodology developed by the State. These analyses may include all crashes, or targeted crash types, depending on the nature of the improvement that was implemented.

Back to Image

Page last modified on December 18, 2017
Safe Roads for a Safer Future - Investment in roadway safety saves lives
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000