The recommended practice of bringing the adjacent soil or aggregate material (unpaved shoulder or modified soil) flush with the top of the pavement often requires frequent maintenance. SafetyEdge℠ eliminates the vertical drop-offs along the pavement edge.
The SafetyEdge℠ improves density at the pavement edge, which makes the pavement more durable. Less frequent road maintenance may be needed as edge raveling is reduced.
FIELD REPORTS
- Delaware SafetyEdge℠ Demonstration Project in Seaford – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway, warm mix asphalt (WMA) overlay project near Seaford, Delaware. SafetyEdge℠ paving devices from two manufacturers were demonstrated during this project.
- Iowa HMA SafetyEdge℠ Demonstration Project in Jasper County – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway hot mix asphalt (HMA) overlay project on Route F62 between the villages of Sully and Lynnville, Iowa. The TransTech Shoulder Wedge Maker was demonstrated during this project.
- Iowa PCC SafetyEdge℠ Demonstration Project in Fairview – [PDF]. This field report documents the observations made on the construction of the SafetyEdge℠ on a two lane highway Portland Cement Concrete (PCC) overlay project on County Highway E34 in the vicinity of Fairview, Iowa.
- Maine SafetyEdge℠ Demonstration Project in Turner – [PDF]. This field report documents the observations made on the construction of the SafetyEdge℠ on a two-lane highway hot mix asphalt (HMA) overlay project in Turner, Maine. The Advant-Edger, TransTech Shoulder Wedge Maker, and TransTech Notched Wedge Joint Maker devices were demonstrated during this project.
- Mississippi SafetyEdge℠ Demonstration Project in Columbus – [PDF]. This field report documents the observations made on the construction of the SafetyEdge℠ on a two-lane highway, hot mix asphalt (HMA) overlay project on State Route 182 near Columbus, Mississippi. The TransTech Shoulder Wedge Maker was demonstrated during this project.
- North Carolina SafetyEdge℠ Demonstration Project on Brogden Road – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway, warm mix asphalt (WMA) overlay project on Brogden Road in Johnston County, North Carolina. The Troxler SafeTSlope Edge Smoother and a device developed by NCDOT were demonstrated during this project.
- North Carolina SafetyEdge℠ Demonstration Project on Little Divine Road – [PDF]. This field report documents the observations made on the construction of the SafetyEdge℠ on a two-lane highway, hot mix asphalt (HMA) overlay project on Little Divine Road in Johnston County, North Carolina. The Carlson end gate device was demonstrated during this project.
- Nebraska SafetyEdge℠ Demonstration Project in Kearney – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway, hot mix asphalt (HMA) overlay project near Kearney, Nebraska. The TransTech Shoulder Wedge Maker device was demonstrated during this project.
- Pennsylvania SafetyEdge℠ Demonstration Project in Elizabethtown – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway, hot mix asphalt (HMA) overlay project near Elizabethtown, Pennsylvania. The Advant-Edger device was demonstrated during this project.
- Wisconsin SafetyEdge℠ Demonstration Project in Menominee County – [PDF]. This field report documents the observations made on the construction of SafetyEdge℠ on a two-lane highway, hot mix asphalt (HMA) overlay project in Menominee County, Wisconsin. SafetyEdge℠ paving devices from two manufacturers were demonstrated during this project.