U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Scale and Scope of Safety Assessment Methods in the Project Development Process
Worksheet 2A
General Information:
- Analyst: PDP Analyst
- Agency or Company: –
- Date Performed: –
Location Information:
- Roadway: Example 4-lane undivided Rural Highway
- Section: Example minor road with stop control
- Jurisdiction: Anywhere, USA
- Analysis Year: 2015
Input Data: Base Conditions / Site Conditions
- Intersection type (3ST, 4ST, 4SG): – / 4ST
- AADTmajor (veh/day) AADTMAX = 78,300 (veh/day): – / 30,000
- AADTminor (veh/day) AADTMAX = 7,400 (veh/day): – / 5,000
- Intersection skew angle (degrees): 0 / 0
- Number of non-STOP-controlled approaches with left-turn lanes (0, 1, 2): 0 / 0
- Number of non-STOP-controlled approaches with right-turn lanes (0, 1, 2, 3, or 4): 0 / 0
- Intersection lighting (present/not present): Not Present / Not Present
- Calibration Factor, Ci: 1.00 / 1.00
back
Page last modified on November 18, 2016