U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content
Facebook iconYouTube iconTwitter iconFlickr iconLinkedInInstagram

Safety

 	

FHWA Home / Safety / Scale and Scope of Safety Assessment Methods in the Project Development Process

Scale and Scope of Safety Assessment Methods in the Project Development Process

LONG DESCRIPTION: PROBLEM OVERVIEW, SECTION 4.3

Safety Assessment Method: SPF with CMF Adjustment

Project Phase: Preliminary & Final Design Project Type: 4R

Related Task: Design Exception

Calculation Method: Tool Based (Hand calculated example included in Guide appendix.)

Comments: This example problem demonstrates how to evaluate the effect a design decision can have on the estimated number of crashes for a rural two-lane, two-way highway horizontal curve re-alignment project.

Level of Analysis: Intermediate

Note: See table 3 for a full definition of Project Type designations.

[ Return to section 4.3 ]

Page last modified on November 18, 2016
Safe Roads for a Safer Future - Investment in roadway safety saves lives
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000